File Records:Sheffield
Jump to navigation
Jump to search
Waddington | Sheffield | Annat | ||||||||||||||||||||||
Waddington--Sheffield | Sheffield--Annat | |||||||||||||||||||||||
1.6km | 3.1km |
Go to Sheffield on the Network Diagram
Name | Alt 1 | Alt 2 | Alt 3 | Date | Details | Railway | Rly 2 | Reference | Source | Locality | Island | Sequence |
Sheffield | Malvern | - | - | 1890 | Mileage 11 miles 50 chains from West Oxford. | Malvern Branch | - | R4, 90/2780 | WRD | Canterbury | S | 52142 |
Sheffield | Malvern | - | - | 1890 | Mileage 23 miles 79 chains from Rolleston Junction. | Malvern Branch | - | R4, 90/2780 | WRD | Canterbury | S | 52143 |
Sheffield | Malvern | - | - | 31/10/1912 | Proposed telephone bureau at station. | Malvern Branch | - | W3734/29 | WRD | Canterbury | S | 52144 |
Sheffield | Malvern | - | - | 9/3/1914 | Request for provision of a verandah. | Malvern Branch | - | W3734/31 | WRD | Canterbury | S | 52145 |
Sheffield | Malvern | - | - | 16/6/1921 | Railway houses. | Malvern Branch | - | W3734/37 | WRD | Canterbury | S | 52146 |
Sheffield | Malvern | - | - | 8/6/1922 | Lighting of station. | Malvern Branch | - | W3734/38 | WRD | Canterbury | S | 52147 |
Sheffield | Malvern | - | - | 19/7/1924 | Post Office removed from station. | Malvern Branch | - | Mails by Rail in NZ | R Startup | Canterbury | S | 52148 |
Sheffield | Malvern | - | - | 14/7/1930 | West Oxford – Sheffield line closed to all traffic. | Malvern Branch | - | W3180, Pub 1/12 | WRD | Canterbury | S | 52149 |
Sheffield | Malvern | - | - | 3/1933 | West Oxford – Sheffield line lifted. | Malvern Branch | - | W3180, Pub 1 | WRD | Canterbury | S | 52150 |
Sheffield | Malvern | - | - | 7/12/1954 | Extension of crossing loop completed. | Malvern Branch | - | W3180, Pub3/10 | WRD | Canterbury | S | 52151 |
Sheffield | Malvern | - | - | 2/10/1960 | Mileage 24 miles 25 chain from Rolleston Junction. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52152 |
Sheffield | Malvern | - | - | 29/3/1981 | Closed to all traffic except traffic in wagon lots and passengers. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52153 |
Sheffield | Malvern | - | - | 3/11/1986 | Closed to goods traffic. | Malvern Branch | - | 00/2107/1 | NZRLS | Canterbury | S | 52154 |
Sheffield | Malvern | - | - | 2/11/1987 | Midland Line – 38.86km from Rolleston (0.00km). | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52155 |
Sheffield | Malvern | - | - | 3/2/1988 | Modern shelter shed, low level platform. | Malvern Branch | - | JRS/P229 | ATL | Canterbury | S | 52156 |
Sheffield | Malvern | - | - | 20/4/1988 | Still used for timetabled running of trains. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52157 |
Sheffield | Malvern | - | - | 18/3/1990 | Modern shelter shed, low level platform. | Malvern Branch | - | JRS/P229 | ATL | Canterbury | S | 52158 |
Sheffield | Malvern | - | - | 18/3/1990 | No sidings. | Malvern Branch | - | JRS/P229 | ATL | Canterbury | S | 52159 |
Sheffield | Malvern | - | - | 1/5/1879 | Loop 30 wagons | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52160 |
Sheffield | Malvern | - | - | 1/5/1879 | Mileage 24 miles 1 chain from Rolleston Junction. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52161 |
Sheffield | Malvern | - | - | 1/6/1883 | Plan of junction of Oxford – Malvern line at Sheffield. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52162 |
Sheffield | Malvern | - | - | 1/8/1898 | Accommodation 3rd class station, passenger platform, cart approach to platform, goods shed 50ft x 40ft, cattle yards, water service, stationmaster's house, urinals. | Malvern Branch | - | R4, 98/2756 | WRD | Canterbury | S | 52163 |
Sheffield | Malvern | - | - | 1/8/1898 | Loop 35 wagons, loop 21 wagons, backshunt 9 wagons (engine shed), backshunt 21 wagons, backshunt 17 wagons (loading bank). | Malvern Branch | - | R4, 98/2756 | WRD | Canterbury | S | 52164 |
Sheffield | Malvern | - | - | 1/9/1882 | Accommodation 3rd class station, passenger platform, cart approach to platform, goods shed 50ft x 40ft, cattle yards, water service, engine shed, stationmaster's house, urinals. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52165 |
Sheffield | Malvern | - | - | 1/9/1882 | Loop 30 wagons | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52166 |
Sheffield | Malvern | - | - | 11/2/1884 | Line between Oxford and Sheffield will be ready for opening shortly. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52167 |
Sheffield | Malvern | - | - | 12/12/1881 | Loop 30 wagons | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52168 |
Sheffield | Malvern | - | - | 15/10/1879 | Loop 30 wagons | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52169 |
Sheffield | Malvern | - | - | 18/8/1876 | Construction of coal siding at Sheffield railway station. | Malvern Branch | - | W 3 | PWD | Canterbury | S | 52170 |
Sheffield | Malvern | - | - | 19/4/1886 | Accommodation 3rd class station, passenger platform, cart approach to platform, goods shed 50ft x 40ft, cattle yards, water service, engine shed, stationmaster's house, urinals. | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52171 |
Sheffield | Malvern | - | - | 19/4/1886 | Loop 25 wagons, loop 21 wagons, backshunt 9 wagons (engine shed), backshunt 21 wagons, backshunt 22 wagons, backshunt 17 wagons (loading bank) | Malvern Branch | - | W 3337 | WRD | Canterbury | S | 52172 |
Sheffield | Malvern | - | - | 23/11/1883 | Requesting authority £15 for fence to be erected around stationmaster's house. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52173 |
Sheffield | Malvern | - | - | 23/7/1884 | Line between Oxford and Sheffield is ready for opening. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52174 |
Sheffield | Malvern | - | - | 24/6/1877 | Grain store site. | Malvern Branch | - | W 70 | PWD | Canterbury | S | 52175 |
Sheffield | Malvern | - | - | 29/4/1882 | Erection of a water vat. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52176 |
Sheffield | Malvern | - | - | 29/7/1876 | Name of Malvern station changed to Sheffield. | Malvern Branch | - | W3180, Pro/24 | WRD | Canterbury | S | 52177 |
Sheffield | Malvern | - | - | 4/1/1878 | Name of Malvern station changed to Sheffield. | Malvern Branch | - | 00/2107/1 | NZRLS | Canterbury | S | 52178 |
Sheffield | Malvern | - | - | 4/12/1884 | Mileage 4 miles 17 chains to Bexley. | Malvern Branch | - | 00/2107/1 | NZRLS | Canterbury | S | 52179 |
Sheffield | Malvern | - | - | 4/12/1884 | The line from Oxford West to Sheffield, a distance of 11 miles 54 chains, will be opened for traffic on 7/8/1884. | Malvern Branch | - | 00/2107/1 | NZRLS | Canterbury | S | 52180 |
Sheffield | Malvern | - | - | 5/1/1880 | Sheffield – Springfield Section opened for traffic. | Malvern Branch | - | W3180, Pub 1/12 | WRD | Canterbury | S | 52181 |
Sheffield | Malvern | - | - | 6/1/1879 | Recommending erection of a weighbridge – cost £110. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52182 |
Sheffield | Malvern | - | - | 7/1/1896 | Letter from Austin Brothers re: siding to their coal mine. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52183 |
Sheffield | Malvern | - | - | 7/12/1878 | Sheffield Extension to terminate near coal pit. | Malvern Branch | - | W 2/44 | PWD | Canterbury | S | 52184 |
Sheffield | Malvern | - | - | 7/4/1879 | First sod turned of the line from Sheffield station to Kowai Pass. | Malvern Branch | - | W3180, Pub 1/12 | WRD | Canterbury | S | 52185 |
Sheffield | Malvern | - | - | 8/10/1895 | Authority wanted for a loading bank. | Malvern Branch | - | W 1820 | WRD | Canterbury | S | 52186 |
Sheffield | Malvern | - | - | 8/10/1898 | Siding to connect Canterbury Colliery siding with Sheffield station yard. | Malvern Branch | - | W3734/14 | WRD | Canterbury | S | 52187 |
Sheffield | Malvern | - | - | 9/9/1899 | Rails for tramway at Sheffield – Canterbury Colliery – Forwarding bank receipt. | Malvern Branch | - | W 3 | PWD | Canterbury | S | 52188 |