Titri | - | - | - | 1890 | Mileage 23 miles 40 chains from Dunedin. | Dunedin – Clinton Section | - | R4, 90/2780 | WRD | Otago | S | 60636 |
Titri | - | - | - | 31/12/1908 | Approval to erect a goods shed 29ft x 20ft, cost about £90. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60637 |
Titri | - | - | - | 6/1/1909 | Provision of goods shed to stand over. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60638 |
Titri | - | - | - | 21/10/1910 | Application for a siding to riverbank. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60639 |
Titri | - | - | - | 14/12/1910 | Provision of conveniences at station. | Dunedin – Clinton Section | - | W3734/28 | WRD | Otago | S | 60640 |
Titri | - | - | - | 31/1/1921 | Approval for provision of goods shed at Titri and Sutton. Each to be 33ft x 30ft; each half of the goods shed at Five Rivers). | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60641 |
Titri | - | - | - | 6/6/1921 | Requesting authority £420 for provision of goods shed. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60642 |
Titri | - | - | - | 10/10/1922 | Requesting additional authority £27.8.9 for provision of goods shed. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60643 |
Titri | - | - | - | 26/6/1933 | Crane is at present dismantled for repairs. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60644 |
Titri | - | - | - | 26/6/1933 | In former years this crane was utilised to transfer goods from and to railway wagons to and from a river boat which plied on the Taieri River between Titri and Taieri Mouth. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60645 |
Titri | - | - | - | 26/6/1933 | The crane has not been used during the last year, having been used on only two occasions during the last three years. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60646 |
Titri | - | - | - | 26/6/1933 | The river service has been abandoned and all traffic for Taieri Mouth is now transported by road. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60647 |
Titri | - | - | - | 18/10/1933 | Fixed 4-ton derrick crane at Titri. The castings are in good order but all timber work and the concrete blocks will require to be renewed. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60648 |
Titri | - | - | - | 10/12/1943 | Approval to remove goods shed from Titri and re-erecting at Waihola. Estimated cost £360. (goods shed is 31ft x 30ft) | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60649 |
Titri | - | - | - | 10/5/1946 | The loops at Titri and Tumai have now been converted into backshunts. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60650 |
Titri | - | - | - | 27/2/1948 | The District Signals & Electrical Engineer, Christchurch, now requires this hut for use by a travelling gang. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60651 |
Titri | - | - | - | 27/2/1948 | The ladies waiting room at Titri, which measures 12ft x 10ft 9ft stud, is not being used as a waiting room and can be made available for transfer to Crichton. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60652 |
Titri | - | - | - | 27/2/1948 | The present building holding the tablet instruments, etc., at Crichton is a Signals Branch portable hut (S & I no 67) which was placed there temporarily some years ago consequence upon the station building at Crichton being demolished by a gale. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60653 |
Titri | - | - | - | 27/2/1948 | The shelter shed (22ft x 9ft) at Titri will be left in position. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60654 |
Titri | - | - | - | 4/10/1950 | Backshunt 11 wagons. | Dunedin – Clinton Section | - | W3199, 03/4107 | WRD | Otago | S | 60655 |
Titri | - | - | - | 21/4/1953 | Station has a shelter shed and a backshunt (11 wagons). | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60656 |
Titri | - | - | - | 6/11/1955 | Closed to all traffic. | Dunedin – Clinton Section | - | W3180, Pub 3 | WRD | Otago | S | 60657 |
Titri | - | - | - | 10/4/1958 | The shelter shed was built in 1876, capital cost £20. It has been taken over as a line gang shelter. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60658 |
Titri | - | - | - | 10/4/1958 | Titri station has been closed for traffic and the siding, being no longer used, has been removed. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60659 |
Titri | - | - | - | 11/4/1967 | House No B463 sold for removal. | Dunedin – Clinton Section | - | R4, 98/2726 | WRD | Otago | S | 60660 |
Titri | - | - | - | 1/5/1879 | Mileage 23 miles 16 chains from Dunedin. | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60661 |
Titri | - | - | - | 1/8/1898 | Accommodation shelter shed, passenger platform, cart approach to platform, crane. | Dunedin – Clinton Section | - | R4, 98/2756 | WRD | Otago | S | 60662 |
Titri | - | - | - | 1/8/1898 | Loop 11 wagons | Dunedin – Clinton Section | - | R4, 98/2756 | WRD | Otago | S | 60663 |
Titri | - | - | - | 1/9/1882 | Accommodation shelter shed, passenger platform, cart approach to platform. | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60664 |
Titri | - | - | - | 1/9/1882 | Backshunt 4 wagons | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60665 |
Titri | - | - | - | 11/7/1898 | Petition for siding at station. | Dunedin – Clinton Section | - | W 1820 | WRD | Otago | S | 60666 |
Titri | - | - | - | 12/12/1881 | Backshunt 4 wagons | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60667 |
Titri | - | - | - | 13/7/1886 | Application for siding from station to river bank. | Dunedin – Clinton Section | - | W 1820 | WRD | Otago | S | 60668 |
Titri | - | - | - | 16/6/1882 | Improvements to passenger station for which £87 was authorised, are finished. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60669 |
Titri | - | - | - | 18/9/1883 | Crane erected this year. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60670 |
Titri | - | - | - | 18/9/1883 | Recommends acquiring additional land at Titri station for extension of siding and formation of approach, etc. | Dunedin – Clinton Section | - | W 1820 | WRD | Otago | S | 60671 |
Titri | - | - | - | 19/4/1886 | Accommodation shelter shed, passenger platform, cart approach to platform, crane. | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60672 |
Titri | - | - | - | 19/4/1886 | Loop 11 wagons | Dunedin – Clinton Section | - | W 3337 | WRD | Otago | S | 60673 |
Titri | - | - | - | 20/1/1879 | Construction of siding at Titri. | Dunedin – Clinton Section | - | W 2/44 | PWD | Otago | S | 60674 |
Titri | - | - | - | 23/2/1899 | Application for a siding from railway station to riverbank declined. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60675 |
Titri | - | - | - | 23/9/1881 | Shelter shed, passenger platform, and backshunt. Centre of platform is at 259 miles 38 chains 53 links. Platform faces on to the main South road. Backshunt runs alongside a canal, which comes off a branch of the Taieri River. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60676 |
Titri | - | - | - | 26/2/1878 | Requesting authority £240.3.0 for siding at Titri to connect with proposed canal. | Dunedin – Clinton Section | - | W 3 | PWD | Otago | S | 60677 |
Titri | - | - | - | 3/9/1883 | Requesting authority £120 for the formation of improved approach road to station. | Dunedin – Clinton Section | - | W 1820 | WRD | Otago | S | 60678 |
Titri | - | - | - | 30/8/1898 | Titri has one loop siding. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60679 |
Titri | - | - | - | 31/1/1895 | Petitioners, Taieri, objecting to proposal to fill up canal from the Taieri River to Titri railway station. | Dunedin – Clinton Section | - | W 1820 | WRD | Otago | S | 60680 |
Titri | - | - | - | 8/9/1883 | Requesting authority £120 for forming of improved approach road to station. | Dunedin – Clinton Section | - | R4, 98/3140 | WRD | Otago | S | 60681 |