File Records:Goose Bay

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
Oaro Goose Bay Puketa
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Oaro--Goose_Bay Goose_Bay--Puketa
3.9km 8.4km

Go to Goose Bay on the Network Diagram



Goose Bay - - - 11/12/1925 Accommodation shelter shed, passenger platform (left side of line). Blenheim – Waipara Railway - 00/2107/1 NZRLS Marlborough S 14987
Goose Bay - - - 11/12/1925 On 15/12/1945, the Hundalee – Kaikoura Section will be taken over by Working Railways. Goose Bay is 107 miles 13 chains from Addington. Blenheim – Waipara Railway - 00/2107/1 NZRLS Marlborough S 14988
Goose Bay - - - 11/12/1925 Sidings nil. Blenheim – Waipara Railway - 00/2107/1 NZRLS Marlborough S 14989
Goose Bay - - - 16/10/1937 Large quarry opened at Goose Bay to provide large boulders for sea protection works along the line. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14990
Goose Bay - - - 27/9/1938 Buildings required at Goose Bay: station building (43ft x 13ft with verandah, PWD Drawing 8849), and two staff cottages. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 14991
Goose Bay - - - 5/7/1939 Goose Bay to have a standard drawing 8848 shelter shed, as it is in a sparsely settled locality and passenger traffic will be practically negligible. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 14992
Goose Bay - - - 18/1/1943 The rails should be laid as far as Goose bay to enable stone for protection works to be railed from the quarry to wherever it is required south of Oaro. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14993
Goose Bay - - - 10/2/1943 Goose Bay contract for latrines and station shelter, 14ft x 8ft. Blenheim – Waipara Railway - W1, 12/71/4 PWD Marlborough S 14994
Goose Bay - - - 31/3/1943 75lb rails to be laid to Goose Bay. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14995
Goose Bay - - - 6/5/1943 Railways Department requisitioned to supply second-hand 70lb rails in suitable condition for verandah roof supports, bent to suit verandah, 5 no for Goose Bay station building. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 14996
Goose Bay - - - 14/5/1943 Formation to Goose Bay is in hand and a commencement will be made with the platelaying on Monday. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14997
Goose Bay - - - 19/6/1943 The railhead at the south end is now at Goose Bay, 2 miles 12 chains north of Oaro. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14998
Goose Bay - - - 24/6/1943 Siding into Goose Bay quarry completed. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 14999
Goose Bay - - - 30/6/1943 Rock is now being conveyed from Goose Bay quarry for sea protection work. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 15000
Goose Bay - - - 30/9/1943 Mr Caldwell is contractor for station buildings. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 15001
Goose Bay - - - 8/11/1943 N Caldwell contractor for erecting station buildings, etc: station building, stockyards, three cottages. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 15002
Goose Bay - - - 19/2/1944 Station building nearly completed. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 15003
Goose Bay - - - 29/7/1948 Name approved for Public Works Department in 1939. Blenheim – Waipara Railway - W3199, 00/2107/1 WRD Marlborough S 15004
Goose Bay - - - 22/6/1950 There is no loop or siding at Goose Bay. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 15005
Goose Bay - - - 2/10/1960 Mileage 108 miles 38 chains from Christchurch. Blenheim – Waipara Railway - W 3337 WRD Marlborough S 15006
Goose Bay - - - 16/7/1977 Closed to all traffic. Blenheim – Waipara Railway - 00/2107/1 NZRLS Marlborough S 15007