Henley Titri Waihola
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Henley--Titri Titri--Waihola
4.8km 2.8km

Go to Titri on the Network Diagram



Name Alt 1 Alt 2 Alt 3 Date Details Railway Rly 2 Reference Source Locality Island Sequence
Titri - - - 1890 Mileage 23 miles 40 chains from Dunedin. Dunedin – Clinton Section - R4, 90/2780 WRD Otago S 60636
Titri - - - 31/12/1908 Approval to erect a goods shed 29ft x 20ft, cost about £90. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60637
Titri - - - 6/1/1909 Provision of goods shed to stand over. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60638
Titri - - - 21/10/1910 Application for a siding to riverbank. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60639
Titri - - - 14/12/1910 Provision of conveniences at station. Dunedin – Clinton Section - W3734/28 WRD Otago S 60640
Titri - - - 31/1/1921 Approval for provision of goods shed at Titri and Sutton.  Each to be 33ft x 30ft; each half of the goods shed at Five Rivers). Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60641
Titri - - - 6/6/1921 Requesting authority £420 for provision of goods shed. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60642
Titri - - - 10/10/1922 Requesting additional authority £27.8.9 for provision of goods shed. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60643
Titri - - - 26/6/1933 Crane is at present dismantled for repairs. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60644
Titri - - - 26/6/1933 In former years this crane was utilised to transfer goods from and to railway wagons to and from a river boat which plied on the Taieri River between Titri and Taieri Mouth. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60645
Titri - - - 26/6/1933 The crane has not been used during the last year, having been used on only two occasions during the last three years. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60646
Titri - - - 26/6/1933 The river service has been abandoned and all traffic for Taieri Mouth is now transported by road. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60647
Titri - - - 18/10/1933 Fixed 4-ton derrick crane at Titri.  The castings are in good order but all timber work and the concrete blocks will require to be renewed. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60648
Titri - - - 10/12/1943 Approval to remove goods shed from Titri and re-erecting at Waihola.  Estimated cost £360.  (goods shed is 31ft x 30ft) Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60649
Titri - - - 10/5/1946 The loops at Titri and Tumai have now been converted into backshunts. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60650
Titri - - - 27/2/1948 The District Signals & Electrical Engineer, Christchurch, now requires this hut for use by a travelling gang. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60651
Titri - - - 27/2/1948 The ladies waiting room at Titri, which measures 12ft x 10ft 9ft stud, is not being used as a waiting room and can be made available for transfer to Crichton. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60652
Titri - - - 27/2/1948 The present building holding the tablet instruments, etc., at Crichton is a Signals Branch portable hut (S & I no 67) which was placed there temporarily some years ago consequence upon the station building at Crichton being demolished by a gale. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60653
Titri - - - 27/2/1948 The shelter shed (22ft x 9ft) at Titri will be left in position. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60654
Titri - - - 4/10/1950 Backshunt 11 wagons. Dunedin – Clinton Section - W3199, 03/4107 WRD Otago S 60655
Titri - - - 21/4/1953 Station has a shelter shed and a backshunt (11 wagons). Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60656
Titri - - - 6/11/1955 Closed to all traffic. Dunedin – Clinton Section - W3180, Pub 3 WRD Otago S 60657
Titri - - - 10/4/1958 The shelter shed was built in 1876, capital cost £20.  It has been taken over as a line gang shelter. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60658
Titri - - - 10/4/1958 Titri station has been closed for traffic and the siding, being no longer used, has been removed. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60659
Titri - - - 11/4/1967 House No B463 sold for removal. Dunedin – Clinton Section - R4, 98/2726 WRD Otago S 60660
Titri - - - 1/5/1879 Mileage 23 miles 16 chains from Dunedin. Dunedin – Clinton Section - W 3337 WRD Otago S 60661
Titri - - - 1/8/1898 Accommodation shelter shed, passenger platform, cart approach to platform, crane. Dunedin – Clinton Section - R4, 98/2756 WRD Otago S 60662
Titri - - - 1/8/1898 Loop 11 wagons Dunedin – Clinton Section - R4, 98/2756 WRD Otago S 60663
Titri - - - 1/9/1882 Accommodation shelter shed, passenger platform, cart approach to platform. Dunedin – Clinton Section - W 3337 WRD Otago S 60664
Titri - - - 1/9/1882 Backshunt 4 wagons Dunedin – Clinton Section - W 3337 WRD Otago S 60665
Titri - - - 11/7/1898 Petition for siding at station. Dunedin – Clinton Section - W 1820 WRD Otago S 60666
Titri - - - 12/12/1881 Backshunt 4 wagons Dunedin – Clinton Section - W 3337 WRD Otago S 60667
Titri - - - 13/7/1886 Application for siding from station to river bank. Dunedin – Clinton Section - W 1820 WRD Otago S 60668
Titri - - - 16/6/1882 Improvements to passenger station for which £87 was authorised, are finished. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60669
Titri - - - 18/9/1883 Crane erected this year. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60670
Titri - - - 18/9/1883 Recommends acquiring additional land at Titri station for extension of siding and formation of approach, etc. Dunedin – Clinton Section - W 1820 WRD Otago S 60671
Titri - - - 19/4/1886 Accommodation shelter shed, passenger platform, cart approach to platform, crane. Dunedin – Clinton Section - W 3337 WRD Otago S 60672
Titri - - - 19/4/1886 Loop 11 wagons Dunedin – Clinton Section - W 3337 WRD Otago S 60673
Titri - - - 20/1/1879 Construction of siding at Titri. Dunedin – Clinton Section - W 2/44 PWD Otago S 60674
Titri - - - 23/2/1899 Application for a siding from railway station to riverbank declined. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60675
Titri - - - 23/9/1881 Shelter shed, passenger platform, and backshunt.  Centre of platform is at 259 miles 38 chains 53 links.  Platform faces on to the main South road.  Backshunt runs alongside a canal, which comes off a branch of the Taieri River. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60676
Titri - - - 26/2/1878 Requesting authority £240.3.0 for siding at Titri to connect with proposed canal. Dunedin – Clinton Section - W 3 PWD Otago S 60677
Titri - - - 3/9/1883 Requesting authority £120 for the formation of improved approach road to station. Dunedin – Clinton Section - W 1820 WRD Otago S 60678
Titri - - - 30/8/1898 Titri has one loop siding. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60679
Titri - - - 31/1/1895 Petitioners, Taieri, objecting to proposal to fill up canal from the Taieri River to Titri railway station. Dunedin – Clinton Section - W 1820 WRD Otago S 60680
Titri - - - 8/9/1883 Requesting authority £120 for forming of improved approach road to station. Dunedin – Clinton Section - R4, 98/3140 WRD Otago S 60681