File Records:Caversham: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{Trail_Station|Prev_Station=Kensington|Next_Station=Burnside|Prev_Section=Kensington--Caversham|Next_Section=Caversham--Burnside|Prev_Dist=1.3km|Next_Dist=2.5...") |
(Initial Data Input) |
||
Line 1: | Line 1: | ||
{{Trail_Station|Prev_Station=[[Kensington]]|Next_Station=[[Burnside]]|Prev_Section=[[Kensington--Caversham]]|Next_Section=[[Caversham--Burnside]]|Prev_Dist=1.3km|Next_Dist=2.5km}} | {{Trail_Station|Prev_Station=[[Kensington]]|Next_Station=[[Burnside]]|Prev_Section=[[Kensington--Caversham]]|Next_Section=[[Caversham--Burnside]]|Prev_Dist=1.3km|Next_Dist=2.5km}} | ||
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | [[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | ||
{| class="wikitable" | |||
|Name | |||
|Alt 1 | |||
|Alt 2 | |||
|Alt 3 | |||
|Date | |||
|Details | |||
|Railway | |||
|Rly 2 | |||
|Reference | |||
|Source | |||
|Locality | |||
|Island | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|6/7/1900 | |||
|Foot planks and hand rail for bridge near Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3734/15 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|7/7/1900 | |||
|Provision of a crossing siding. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3734/15 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|19/10/1901 | |||
|Separation of the Cavendish Post Office from the railway station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3734/16 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/12/1901 | |||
|Post Office removed from station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|Mails by Rail in NZ | |||
|R Startup | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1890 | |||
|Mileage 2 miles 8 chains from Dunedin. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 90/2780 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|5/11/1906 | |||
|Dunedin – Mosgiel Duplication – taking additional land at Caversham. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/6/1907 | |||
|Automatic tablet exchanger apparatus provided. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|22/3/1910 | |||
|Protest re site of new railway station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3734/27 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|9/4/1912 | |||
|Taking additional land for railway purposes. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|9/9/1913 | |||
|Taking additional land for railway purposes. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|16/11/1922 | |||
|Application for siding near Caversham Gas Works. Site of proposed siding now occupied by present Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|29/7/1944 | |||
|On 31/7/1944, Stop & Stay signal No 23843 will be moved to a point 70 yards south of its present position and will be renumbered 23847. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 99/1796 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|11/4/1967 | |||
|House No 226 sold for removal. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 98/2726 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|13/8/1983 | |||
|Closed to all traffic. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|13/8/1983 | |||
|Closed to all traffic. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|00/2107/1 | |||
|NZRLS | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/5/1879 | |||
|Backshunt 5 wagons | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/5/1879 | |||
|Mileage 2 miles 10 chains from Dunedin. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/8/1898 | |||
|Accommodation 5<sup>th</sup> class station, passenger platform, cart approach to platform, fixed signals, urinals. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 98/2756 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/8/1898 | |||
|Backshunt 8 wagons. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 98/2756 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/9/1882 | |||
|Accommodation 5<sup>th</sup> class station, passenger platform, cart approach to platform, urinals. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|1/9/1882 | |||
|Backshunt 4 wagons | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|10/1/1871 | |||
|Application for two or three of the imported iron girders for a railway bridge at Caversham, either free of cost or as otherwise as may be arranged. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|OP 9 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|10/2/1881 | |||
|Requesting authority for a gate at station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|10/4/1879 | |||
|Mason Wales & Coy – conveying 7-ton boiler over railway bridge at Caversham Tunnel. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 2/44 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|11/1/1889 | |||
|Town Clerk, Caversham – respecting excess charge by Department for laying drain under line at Caversham. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|12/12/1881 | |||
|Backshunt 3 wagons | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|12/5/1885 | |||
|Town Clerk, Caversham – asking that crossing and siding at Caversham be lighted with gas. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|13/5/1874 | |||
|Two tenders received for Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|15/10/1879 | |||
|Backshunt 5 wagons | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|15/12/1876 | |||
|Additions to Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|16/1/1888 | |||
|Council to form footpath approach from Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|16/8/1883 | |||
|Proposed deviation of line at Anderson's Bay Road, Caversham. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|16/9/1884 | |||
|Application for a public siding near Caversham gas works. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|17/1/1871 | |||
|Supply what can be spared at £18 per ton. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|OP 9 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|19/10/1882 | |||
|Improved siding accommodation urgently needed. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|19/4/1886 | |||
|Accommodation 5<sup>th</sup> class station, passenger platform, cart approach to platform, urinals. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|19/4/1886 | |||
|Backshunt 8 wagons | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|2/12/1880 | |||
|Application for siding to Caversham Gas Works. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|21/10/1882 | |||
|Recommending erection of fixed signals at Caversham. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|23/6/1896 | |||
|Town Clerk, Caversham – Widening road under bridge. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|26/11/1880 | |||
|Report and estimate for Caversham overbridge. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|26/8/1876 | |||
|Post Office operated by Railways Department staff opened. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|Mails by Rail in NZ | |||
|R Startup | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|27/1/1888 | |||
|Authority issued for £120 for overbridge for the Caversham Borough Council to the recreation ground. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|27/2/1888 | |||
|Caversham footbridge – material being prepared in Dunedin yard. Work will commence on ground in a few days and completed in about a fortnight. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|27/8/1887 | |||
|Defence Department – asking that cottages on railway reserve, Caversham, be handed over to Police Department. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|29/12/1877 | |||
|Requesting authority £250 for waiting room for station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|29/2/1892 | |||
|Alterations required to offices at station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|3/9/1895 | |||
|Report as to metalling Cargill and McGlason Streets. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|30/6/1884 | |||
|Contract let to Meilke & Campbell for Caversham station - £295.7.0. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|AJHR, 1874 | |||
|Natlib | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|31/3/1883 | |||
|Caversham Tunnel – fence constructed - £30/19/9. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 83/2044 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|31/3/1883 | |||
|Caversham Tunnel – footbridge constructed. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 83/2044 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|5/8/1874 | |||
|Meikle & Campbell's contract for station completed. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 12 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|6/12/1875 | |||
|Caversham station should be connected with the telegraph wires. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|OP 10/7 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|6/7/1875 | |||
|Siding at Caversham station. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|OP 7 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|8/12/1887 | |||
|Caversham station is situated between Catherine and Clark Streets. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|8/12/1887 | |||
|There are two private level crossings at 237 miles 67.80 chains and 238 miles 1.00 chains serving the Gas Works property and Mr Fulton's, respectively. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|R4, 87/4162 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|9/2/1883 | |||
|Recommending station be fitted with gas. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 1820 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|9/5/1887 | |||
|Caversham station – land for railway – exchange of land with Mr Rodgers. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W 3 | |||
|PWD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|23/7/1925 | |||
|Water being supplied to New Zealand Breweries. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|15/12/1925 | |||
|Water being supplied to Cowie Brewery Coy Ltd. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|17/7/1928 | |||
|Water being supplied to Cowie Brewery Coy Ltd. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|16/4/1932 | |||
|The Dunedin City Council has agreed to reduce the charge for water used by the Department at Hillside, Caversham, and Kensington. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|20/5/1932 | |||
|Water right transferred from Otago Brewery Coy Ltd to Duncan & Coy. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|18/5/1872 | |||
|The Caversham tunnel is progressing rapidly. It is now in a length of 16 chains and is cut under the Industrial School. The cutting leading to the tunnel at the north end has been completed and the work of forming the tunnel from that end was begun yesterday. It is expected the tunnel will be opened through by at least July. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|A&NZG | |||
|ATL | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|2/5/1895 | |||
|Mr J J Briggs is to obtain a supply of water for his brewery from Caversham. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|2/5/1895 | |||
|Spring at Caversham supplies water to the Hillside Workshops. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|22/3/1892 | |||
|Lease to Mr J R Briggs of the privilege of a water from the spring at Caversham Tunnel | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|25/5/1874 | |||
|The work of reclaiming the site for the chief railway station at Dunedin is being proceeded with. The earth being brought in from the back of the church on the hill side at Caversham in wagons by railway. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|A&NZG | |||
|ATL | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|4/2/1893 | |||
|Water supply for Mr Briggs has never been laid on. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|R4, 98/3954 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|7/7/1875 | |||
|Reporting that the engine now being worked by Mr Calvin was off the line twice yesterday, the first time within the reclaimed ground – which did not cause any interference with the regular traffic – and the second time near the main line at Caversham, causing an obstruction to the 4.45pm down train, which was delayed 30 minutes in starting, and owing to the Caversham Siding being filled with earth wagons, the passenger train could not be shunted and had to be pushed back to Dunedin by the engine, which is very unsafe. In both cases the engine left the rails to the want of proper switches, instead of which, rails are used to “swing” between the two roads. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|OP 7, 16434 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham | |||
| - | |||
| - | |||
| - | |||
|7/7/1875 | |||
|We are running 36 trains per day between Dunedin and Caversham on a single line of rails, and as new coal pits are now being opened at Green Island, and the opening of the line to the Clutha will shortly take place, the number of trains will be considerably augmented. | |||
|Dunedin – Clutha Railway | |||
| - | |||
|OP 7, 16434 | |||
|OPR | |||
|Otago | |||
|S | |||
|- | |||
|Caversham New Tunnel | |||
| - | |||
| - | |||
| - | |||
|25/10/1910 | |||
|Disposal of the gas engine at Caversham Tunnel. (Sale of about £100 approved.) | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3734/28 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|22/8/1907 | |||
|The Tunnel is between Caversham and Cattle Yards. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|19/12/1910 | |||
|The Dunedin Corporation has water pipes running through the tunnel. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|19/12/1910 | |||
|The old tunnel will not be required by the Department after about the end of March. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|13/3/1914 | |||
|Now the duplication of the line between Dunedin and Mosgiel is finished the old railway tunnel at Caversham will fall into disuse so far as the Railway Department is concerned. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|6/2/1915 | |||
|In order to gain access to the tunnel at the north end pedestrians must either make use of the gate of a private level crossing over the old railway line or climb the railway fence, and the latter course has to be adopted by those who wish to gain access at the south end. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|6/2/1915 | |||
|Inside the tunnel the track in places is rough, wet and dirty under foot. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|6/2/1915 | |||
|There being no direct access at either end, persons who make use of the railway reserve and tunnel are really in the position of trespassers. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|11/12/1916 | |||
|Approval to lease the old tunnel to the Dunedin City Council approved. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|12/8/1919 | |||
|Application by the Council for permission for the conveyance of meat from the Abattoir at Burnside to the city by motors through the tunnel on the inward trip declined. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|20/4/1937 | |||
|At either end of the tunnel is an overbridge (Nos 192 and 193). Bridge No 192 is a 25 foot plate girder span and the bridge is about 60 years old. Bridge No 193 consists of three timber spans of about 15 feet each and is 37 years old. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|17/4/1940 | |||
|The bridge carries the Kaikorai Valley Road over the old railway cutting and the Taieri County Council has asked permission to fill in across the cutting and eliminate the bridge in order to do away with dangerous curves in the road at each end of the overbridge. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|17/4/1940 | |||
|There is an old overbridge (No 193) at the south end of the old Caversham Tunnel which was abandoned when the Dunedin – Mosgiel duplication was carried out. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|19/4/1940 | |||
|Approval to remove old Bridge No 193 and fill in cutting. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|5/3/1942 | |||
|Old tunnel to be used as an air raid shelter. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|23/7/1947 | |||
|There are two overbridges on the approaches to the tunnel. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|10/9/1948 | |||
|In 1878 the City Corporation entered into a bond to the Department for £1,000 for the right to lay a line of water pipe through the tunnel and in 1917 were granted a lease of the tunnel at £20 per annum. The lease is still current. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|10/9/1948 | |||
|The Hillside water supply is a subsidiary one for hydraulic purposes and is collected from the new tunnel, from the Caversham Valley Road catchment area and from the old tunnel. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|3/1956 | |||
|Removal of Bridge No 193 and the filling in of the old railway cutting under it approved. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|26/10/1961 | |||
|The old Caversham Tunnel was constructed in the years 1871 and 1872. The line of railway was opened for traffic on 1/7/1874. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|5/9/1967 | |||
|In 1957 the tunnel approach areas were declared Crown land and handed over to the Council by the Lands Department. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|5/9/1967 | |||
|The old Caversham Tunnel and the approaches thereto were leased to the Dunedin City Council from 1911. The tunnel carries water, sewage, and other city services. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3199, 14/1845 | |||
|WRD | |||
|Otago | |||
|S | |||
|- | |||
|Caversham Old Tunnel | |||
| - | |||
| - | |||
| - | |||
|6/3/1873 | |||
|Construction of the Caversham Tunnel has been completed. | |||
|Dunedin – Clinton Railway | |||
| - | |||
|W3180, Pub 1/9 | |||
|WRD | |||
|Otago | |||
|S | |||
|} |
Latest revision as of 07:41, 5 February 2022
Kensington | Caversham | Burnside | ||||||||||||||||||||||
Kensington--Caversham | Caversham--Burnside | |||||||||||||||||||||||
1.3km | 2.5km |
Go to Caversham on the Network Diagram
Name | Alt 1 | Alt 2 | Alt 3 | Date | Details | Railway | Rly 2 | Reference | Source | Locality | Island |
Caversham | - | - | - | 6/7/1900 | Foot planks and hand rail for bridge near Caversham station. | Dunedin – Clinton Railway | - | W3734/15 | WRD | Otago | S |
Caversham | - | - | - | 7/7/1900 | Provision of a crossing siding. | Dunedin – Clinton Railway | - | W3734/15 | WRD | Otago | S |
Caversham | - | - | - | 19/10/1901 | Separation of the Cavendish Post Office from the railway station. | Dunedin – Clinton Railway | - | W3734/16 | WRD | Otago | S |
Caversham | - | - | - | 1/12/1901 | Post Office removed from station. | Dunedin – Clinton Railway | - | Mails by Rail in NZ | R Startup | Otago | S |
Caversham | - | - | - | 1890 | Mileage 2 miles 8 chains from Dunedin. | Dunedin – Clinton Railway | - | R4, 90/2780 | WRD | Otago | S |
Caversham | - | - | - | 5/11/1906 | Dunedin – Mosgiel Duplication – taking additional land at Caversham. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 1/6/1907 | Automatic tablet exchanger apparatus provided. | Dunedin – Clinton Railway | - | W3337 | WRD | Otago | S |
Caversham | - | - | - | 22/3/1910 | Protest re site of new railway station. | Dunedin – Clinton Railway | - | W3734/27 | WRD | Otago | S |
Caversham | - | - | - | 9/4/1912 | Taking additional land for railway purposes. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 9/9/1913 | Taking additional land for railway purposes. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 16/11/1922 | Application for siding near Caversham Gas Works. Site of proposed siding now occupied by present Caversham station. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 29/7/1944 | On 31/7/1944, Stop & Stay signal No 23843 will be moved to a point 70 yards south of its present position and will be renumbered 23847. | Dunedin – Clinton Railway | - | R4, 99/1796 | WRD | Otago | S |
Caversham | - | - | - | 11/4/1967 | House No 226 sold for removal. | Dunedin – Clinton Railway | - | R4, 98/2726 | WRD | Otago | S |
Caversham | - | - | - | 13/8/1983 | Closed to all traffic. | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 13/8/1983 | Closed to all traffic. | Dunedin – Clinton Railway | - | 00/2107/1 | NZRLS | Otago | S |
Caversham | - | - | - | 1/5/1879 | Backshunt 5 wagons | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 1/5/1879 | Mileage 2 miles 10 chains from Dunedin. | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 1/8/1898 | Accommodation 5th class station, passenger platform, cart approach to platform, fixed signals, urinals. | Dunedin – Clinton Railway | - | R4, 98/2756 | WRD | Otago | S |
Caversham | - | - | - | 1/8/1898 | Backshunt 8 wagons. | Dunedin – Clinton Railway | - | R4, 98/2756 | WRD | Otago | S |
Caversham | - | - | - | 1/9/1882 | Accommodation 5th class station, passenger platform, cart approach to platform, urinals. | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 1/9/1882 | Backshunt 4 wagons | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 10/1/1871 | Application for two or three of the imported iron girders for a railway bridge at Caversham, either free of cost or as otherwise as may be arranged. | Dunedin – Clinton Railway | - | OP 9 | OPR | Otago | S |
Caversham | - | - | - | 10/2/1881 | Requesting authority for a gate at station. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 10/4/1879 | Mason Wales & Coy – conveying 7-ton boiler over railway bridge at Caversham Tunnel. | Dunedin – Clinton Railway | - | W 2/44 | PWD | Otago | S |
Caversham | - | - | - | 11/1/1889 | Town Clerk, Caversham – respecting excess charge by Department for laying drain under line at Caversham. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 12/12/1881 | Backshunt 3 wagons | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 12/5/1885 | Town Clerk, Caversham – asking that crossing and siding at Caversham be lighted with gas. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 13/5/1874 | Two tenders received for Caversham station. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 15/10/1879 | Backshunt 5 wagons | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 15/12/1876 | Additions to Caversham station. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 16/1/1888 | Council to form footpath approach from Caversham station. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 16/8/1883 | Proposed deviation of line at Anderson's Bay Road, Caversham. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 16/9/1884 | Application for a public siding near Caversham gas works. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 17/1/1871 | Supply what can be spared at £18 per ton. | Dunedin – Clinton Railway | - | OP 9 | OPR | Otago | S |
Caversham | - | - | - | 19/10/1882 | Improved siding accommodation urgently needed. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 19/4/1886 | Accommodation 5th class station, passenger platform, cart approach to platform, urinals. | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 19/4/1886 | Backshunt 8 wagons | Dunedin – Clinton Railway | - | W 3337 | WRD | Otago | S |
Caversham | - | - | - | 2/12/1880 | Application for siding to Caversham Gas Works. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 21/10/1882 | Recommending erection of fixed signals at Caversham. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 23/6/1896 | Town Clerk, Caversham – Widening road under bridge. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 26/11/1880 | Report and estimate for Caversham overbridge. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 26/8/1876 | Post Office operated by Railways Department staff opened. | Dunedin – Clinton Railway | - | Mails by Rail in NZ | R Startup | Otago | S |
Caversham | - | - | - | 27/1/1888 | Authority issued for £120 for overbridge for the Caversham Borough Council to the recreation ground. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 27/2/1888 | Caversham footbridge – material being prepared in Dunedin yard. Work will commence on ground in a few days and completed in about a fortnight. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 27/8/1887 | Defence Department – asking that cottages on railway reserve, Caversham, be handed over to Police Department. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 29/12/1877 | Requesting authority £250 for waiting room for station. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 29/2/1892 | Alterations required to offices at station. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 3/9/1895 | Report as to metalling Cargill and McGlason Streets. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 30/6/1884 | Contract let to Meilke & Campbell for Caversham station - £295.7.0. | Dunedin – Clinton Railway | - | AJHR, 1874 | Natlib | Otago | S |
Caversham | - | - | - | 31/3/1883 | Caversham Tunnel – fence constructed - £30/19/9. | Dunedin – Clinton Railway | - | R4, 83/2044 | WRD | Otago | S |
Caversham | - | - | - | 31/3/1883 | Caversham Tunnel – footbridge constructed. | Dunedin – Clinton Railway | - | R4, 83/2044 | WRD | Otago | S |
Caversham | - | - | - | 5/8/1874 | Meikle & Campbell's contract for station completed. | Dunedin – Clinton Railway | - | W 12 | PWD | Otago | S |
Caversham | - | - | - | 6/12/1875 | Caversham station should be connected with the telegraph wires. | Dunedin – Clinton Railway | - | OP 10/7 | OPR | Otago | S |
Caversham | - | - | - | 6/7/1875 | Siding at Caversham station. | Dunedin – Clinton Railway | - | OP 7 | OPR | Otago | S |
Caversham | - | - | - | 8/12/1887 | Caversham station is situated between Catherine and Clark Streets. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 8/12/1887 | There are two private level crossings at 237 miles 67.80 chains and 238 miles 1.00 chains serving the Gas Works property and Mr Fulton's, respectively. | Dunedin – Clinton Railway | - | R4, 87/4162 | WRD | Otago | S |
Caversham | - | - | - | 9/2/1883 | Recommending station be fitted with gas. | Dunedin – Clinton Railway | - | W 1820 | WRD | Otago | S |
Caversham | - | - | - | 9/5/1887 | Caversham station – land for railway – exchange of land with Mr Rodgers. | Dunedin – Clinton Railway | - | W 3 | PWD | Otago | S |
Caversham | - | - | - | 23/7/1925 | Water being supplied to New Zealand Breweries. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 15/12/1925 | Water being supplied to Cowie Brewery Coy Ltd. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 17/7/1928 | Water being supplied to Cowie Brewery Coy Ltd. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 16/4/1932 | The Dunedin City Council has agreed to reduce the charge for water used by the Department at Hillside, Caversham, and Kensington. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 20/5/1932 | Water right transferred from Otago Brewery Coy Ltd to Duncan & Coy. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 18/5/1872 | The Caversham tunnel is progressing rapidly. It is now in a length of 16 chains and is cut under the Industrial School. The cutting leading to the tunnel at the north end has been completed and the work of forming the tunnel from that end was begun yesterday. It is expected the tunnel will be opened through by at least July. | Dunedin – Clutha Railway | - | A&NZG | ATL | Otago | S |
Caversham | - | - | - | 2/5/1895 | Mr J J Briggs is to obtain a supply of water for his brewery from Caversham. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 2/5/1895 | Spring at Caversham supplies water to the Hillside Workshops. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 22/3/1892 | Lease to Mr J R Briggs of the privilege of a water from the spring at Caversham Tunnel | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 25/5/1874 | The work of reclaiming the site for the chief railway station at Dunedin is being proceeded with. The earth being brought in from the back of the church on the hill side at Caversham in wagons by railway. | Dunedin – Clutha Railway | - | A&NZG | ATL | Otago | S |
Caversham | - | - | - | 4/2/1893 | Water supply for Mr Briggs has never been laid on. | Dunedin – Clutha Railway | - | R4, 98/3954 | WRD | Otago | S |
Caversham | - | - | - | 7/7/1875 | Reporting that the engine now being worked by Mr Calvin was off the line twice yesterday, the first time within the reclaimed ground – which did not cause any interference with the regular traffic – and the second time near the main line at Caversham, causing an obstruction to the 4.45pm down train, which was delayed 30 minutes in starting, and owing to the Caversham Siding being filled with earth wagons, the passenger train could not be shunted and had to be pushed back to Dunedin by the engine, which is very unsafe. In both cases the engine left the rails to the want of proper switches, instead of which, rails are used to “swing” between the two roads. | Dunedin – Clutha Railway | - | OP 7, 16434 | OPR | Otago | S |
Caversham | - | - | - | 7/7/1875 | We are running 36 trains per day between Dunedin and Caversham on a single line of rails, and as new coal pits are now being opened at Green Island, and the opening of the line to the Clutha will shortly take place, the number of trains will be considerably augmented. | Dunedin – Clutha Railway | - | OP 7, 16434 | OPR | Otago | S |
Caversham New Tunnel | - | - | - | 25/10/1910 | Disposal of the gas engine at Caversham Tunnel. (Sale of about £100 approved.) | Dunedin – Clinton Railway | - | W3734/28 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 22/8/1907 | The Tunnel is between Caversham and Cattle Yards. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 19/12/1910 | The Dunedin Corporation has water pipes running through the tunnel. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 19/12/1910 | The old tunnel will not be required by the Department after about the end of March. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 13/3/1914 | Now the duplication of the line between Dunedin and Mosgiel is finished the old railway tunnel at Caversham will fall into disuse so far as the Railway Department is concerned. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 6/2/1915 | In order to gain access to the tunnel at the north end pedestrians must either make use of the gate of a private level crossing over the old railway line or climb the railway fence, and the latter course has to be adopted by those who wish to gain access at the south end. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 6/2/1915 | Inside the tunnel the track in places is rough, wet and dirty under foot. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 6/2/1915 | There being no direct access at either end, persons who make use of the railway reserve and tunnel are really in the position of trespassers. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 11/12/1916 | Approval to lease the old tunnel to the Dunedin City Council approved. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 12/8/1919 | Application by the Council for permission for the conveyance of meat from the Abattoir at Burnside to the city by motors through the tunnel on the inward trip declined. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 20/4/1937 | At either end of the tunnel is an overbridge (Nos 192 and 193). Bridge No 192 is a 25 foot plate girder span and the bridge is about 60 years old. Bridge No 193 consists of three timber spans of about 15 feet each and is 37 years old. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 17/4/1940 | The bridge carries the Kaikorai Valley Road over the old railway cutting and the Taieri County Council has asked permission to fill in across the cutting and eliminate the bridge in order to do away with dangerous curves in the road at each end of the overbridge. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 17/4/1940 | There is an old overbridge (No 193) at the south end of the old Caversham Tunnel which was abandoned when the Dunedin – Mosgiel duplication was carried out. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 19/4/1940 | Approval to remove old Bridge No 193 and fill in cutting. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 5/3/1942 | Old tunnel to be used as an air raid shelter. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 23/7/1947 | There are two overbridges on the approaches to the tunnel. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 10/9/1948 | In 1878 the City Corporation entered into a bond to the Department for £1,000 for the right to lay a line of water pipe through the tunnel and in 1917 were granted a lease of the tunnel at £20 per annum. The lease is still current. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 10/9/1948 | The Hillside water supply is a subsidiary one for hydraulic purposes and is collected from the new tunnel, from the Caversham Valley Road catchment area and from the old tunnel. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 3/1956 | Removal of Bridge No 193 and the filling in of the old railway cutting under it approved. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 26/10/1961 | The old Caversham Tunnel was constructed in the years 1871 and 1872. The line of railway was opened for traffic on 1/7/1874. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 5/9/1967 | In 1957 the tunnel approach areas were declared Crown land and handed over to the Council by the Lands Department. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 5/9/1967 | The old Caversham Tunnel and the approaches thereto were leased to the Dunedin City Council from 1911. The tunnel carries water, sewage, and other city services. | Dunedin – Clinton Railway | - | W3199, 14/1845 | WRD | Otago | S |
Caversham Old Tunnel | - | - | - | 6/3/1873 | Construction of the Caversham Tunnel has been completed. | Dunedin – Clinton Railway | - | W3180, Pub 1/9 | WRD | Otago | S |