{{ | {{Trail_Station|Prev_Station=[[Oaro]]|Next_Station=[[Puketa]]|Prev_Section=[[Oaro--Goose_Bay]]|Next_Section=[[Goose_Bay--Puketa]]}} | ||
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | [[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | ||
Revision as of 05:30, 22 January 2022
Oaro | Goose Bay | Puketa | ||||||||||||||||||||||
Oaro--Goose_Bay | Goose_Bay--Puketa | |||||||||||||||||||||||
{{{Prev_Dist}}} | {{{Next_Dist}}} |
Go to Goose Bay on the Network Diagram
Goose Bay | - | - | - | 11/12/1925 | Accommodation shelter shed, passenger platform (left side of line). | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 14987 |
Goose Bay | - | - | - | 11/12/1925 | On 15/12/1945, the Hundalee – Kaikoura Section will be taken over by Working Railways. Goose Bay is 107 miles 13 chains from Addington. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 14988 |
Goose Bay | - | - | - | 11/12/1925 | Sidings nil. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 14989 |
Goose Bay | - | - | - | 16/10/1937 | Large quarry opened at Goose Bay to provide large boulders for sea protection works along the line. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14990 |
Goose Bay | - | - | - | 27/9/1938 | Buildings required at Goose Bay: station building (43ft x 13ft with verandah, PWD Drawing 8849), and two staff cottages. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 14991 |
Goose Bay | - | - | - | 5/7/1939 | Goose Bay to have a standard drawing 8848 shelter shed, as it is in a sparsely settled locality and passenger traffic will be practically negligible. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 14992 |
Goose Bay | - | - | - | 18/1/1943 | The rails should be laid as far as Goose bay to enable stone for protection works to be railed from the quarry to wherever it is required south of Oaro. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14993 |
Goose Bay | - | - | - | 10/2/1943 | Goose Bay contract for latrines and station shelter, 14ft x 8ft. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | S | 14994 |
Goose Bay | - | - | - | 31/3/1943 | 75lb rails to be laid to Goose Bay. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14995 |
Goose Bay | - | - | - | 6/5/1943 | Railways Department requisitioned to supply second-hand 70lb rails in suitable condition for verandah roof supports, bent to suit verandah, 5 no for Goose Bay station building. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 14996 |
Goose Bay | - | - | - | 14/5/1943 | Formation to Goose Bay is in hand and a commencement will be made with the platelaying on Monday. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14997 |
Goose Bay | - | - | - | 19/6/1943 | The railhead at the south end is now at Goose Bay, 2 miles 12 chains north of Oaro. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14998 |
Goose Bay | - | - | - | 24/6/1943 | Siding into Goose Bay quarry completed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 14999 |
Goose Bay | - | - | - | 30/6/1943 | Rock is now being conveyed from Goose Bay quarry for sea protection work. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 15000 |
Goose Bay | - | - | - | 30/9/1943 | Mr Caldwell is contractor for station buildings. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 15001 |
Goose Bay | - | - | - | 8/11/1943 | N Caldwell contractor for erecting station buildings, etc: station building, stockyards, three cottages. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 15002 |
Goose Bay | - | - | - | 19/2/1944 | Station building nearly completed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 15003 |
Goose Bay | - | - | - | 29/7/1948 | Name approved for Public Works Department in 1939. | Blenheim – Waipara Railway | - | W3199, 00/2107/1 | WRD | Marlborough | S | 15004 |
Goose Bay | - | - | - | 22/6/1950 | There is no loop or siding at Goose Bay. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 15005 |
Goose Bay | - | - | - | 2/10/1960 | Mileage 108 miles 38 chains from Christchurch. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 15006 |
Goose Bay | - | - | - | 16/7/1977 | Closed to all traffic. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 15007 |