File Records:Houipapa

From Railway Knowledge Base for New Zealand
Revision as of 08:24, 25 February 2022 by Robert (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ratanui Houipapa Tawanui
Trail StnSLC.png Trail SectRC.png Trail StnLC.png Trail SectRC.png Trail StnSRC.png
Ratanui--Houipapa Houipapa--Tawanui
3.9km 5.6km

Go to Houipapa on the Network Diagram


Name Alternative Name 1 Alternative Name 2 Alternative Name 3 Date Details Railway Railway 2 Reference Source Locality Island Sequence
Houipapa - - - 1907 Rails laid to station. Catlins River Branch - W3180, Pub 1/9 WRD Otago S 19350
Houipapa - - - 20/7/1905 Petition for siding at Houipapa. Catlins River Branch - W 3 PWD Otago S 19351
Houipapa - - - 13/1/1906 Petition from settlers for a siding. Catlins River Branch - W 3 PWD Otago S 19352
Houipapa - - - 9/1/1907 Metalling section of road near station. Catlins River Branch - W 3 PWD Otago S 19353
Houipapa - - - 6/3/1907 Metalling deviation road to station. Catlins River Branch - W 3 PWD Otago S 19354
Houipapa - - - 26/8/1907 Houipapa Section – tramway crossing required for Latta Brothers. Catlins River Branch - W 3 PWD Otago S 19355
Houipapa - - - 13/1/1908 Houipapa station – suggested alterations to approach road on passenger side. Catlins River Branch - W 3 PWD Otago S 19356
Houipapa - - - 31/3/1908 Goods trains running to Houipapa. Catlins River Branch - W3180, Pub 1/9 WRD Otago S 19357
Houipapa - - - 9/5/1908 Approval to purchase timber for the goods shed. Catlins River Branch - W2278, 03/1014 WRD Southland S 19358
Houipapa - - - 12/5/1908 Platelayer's cottage – schedule of tenders. Catlins River Branch - W 3 PWD Otago S 19359
Houipapa - - - 22/5/1908 One platelayer's cottage contract let to Geo T Harrington, Purerireki. Catlins River Branch - W 34/1 PWD Otago S 19360
Houipapa - - - 24/7/1908 Platelayer's cottage – contract signed. Catlins River Branch - W 3 PWD Otago S 19361
Houipapa - - - 22/8/1908 Above contract completed. Catlins River Branch - W 34/1 PWD Otago S 19362
Houipapa - - - 14/9/1908 Station buildings – shelter shed, etc. - requesting authority £80. Catlins River Branch - W 3 PWD Otago S 19363
Houipapa - - - 16/10/1908 Platelayer's cottage – final certificate. Catlins River Branch - W 3 PWD Otago S 19364
Houipapa - - - 16/10/1908 A small store room is to be added to the shelter shed. Catlins River Branch - W2278, 03/1014 WRD Southland S 19365
Houipapa - - - 22/12/1908 Goods shed – schedule of tenders. Catlins River Branch - W 3 PWD Otago S 19366
Houipapa - - - 9/1/1909 Goods shed, 20ft x 30ft, contract let to John Barby, Balclutha, amount £235.17.0. Catlins River Branch - W 34/1 PWD Otago S 19367
Houipapa - - - 21/1/1909 Goods shed – contract signed. Catlins River Branch - W 3 PWD Otago S 19368
Houipapa - - - 3/4/1909 John Barby's contract for goods shed (20ft x 30ft) completed. Catlins River Branch - W 12 PWD Otago S 19369
Houipapa - - - 9/4/1909 Above contract completed. Catlins River Branch - W 3 PWD Otago S 19370
Houipapa - - - 2/10/1909 Plan of proposed new crusher site above Houipapa station for approval. Catlins River Branch - W 3 PWD Otago S 19371
Houipapa - - - 10/11/1909 Goods traffic to Houipapa. Catlins River Branch - W 3 PWD Otago S 19372
Houipapa - - - 17/12/1909 Houipapa – Catlins River Section opened for traffic. Catlins River Branch - W3180, Pub 1/9 WRD Otago S 19373
Houipapa - - - 20/3/1913 Stone crushing plant at Houipapa. - This should be left when Extension is handed over. Catlins River Branch - W 3 PWD Otago S 19374
Houipapa - - - 4/2/1915 Houipapa – Tahakopa Section handed over to Railway Department. Catlins River Branch - W3180, Pub 1/9 WRD Otago S 19375
Houipapa - - - 16/8/1940 Approval to lift long backshunt. Catlins River Branch - W2559, 505/4/2 WRD Otago S 19376
Houipapa - - - 4/3/1963 Mileage 25 miles 17 chains from Balclutha. Catlins River Branch - W 3337 WRD Otago S 19377
Houipapa - - - 27/2/1971 Closed to all traffic. Catlins River Branch - W3180, Pub 3 WRD Otago S 19378