File Records:Kokonga
Jump to navigation
Jump to search
Tiroiti | Kokonga | Waipiata | ||||||||||||||||||||||
Tiroiti--Kokonga | Kokonga--Waipiata | |||||||||||||||||||||||
7.7km | 10.1km |
Go to Kokonga on the Network Diagram
Name | Alternative Name 1 | Alternative Name 2 | Alternative Name 3 | Date | Details | Railway | Railway 2 | Reference | Source | Locality | Island | Sequence |
Kokonga | - | - | - | 20/8/1900 | Clearance of cattle yards. | Otago Central Railway | - | W3734/15 | WRD | Otago | S | 24367 |
Kokonga | - | - | - | 6/12/1909 | Automatic tablet exchanger apparatus provided. | Otago Central Railway | - | W3337 | WRD | Otago | S | 24368 |
Kokonga | - | - | - | 14/5/1915 | Telephone connection. | Otago Central Railway | - | W3734/32 | WRD | Otago | S | 24369 |
Kokonga | - | - | - | 14/7/1938 | Authority to provide bathroom in House No 179. | Otago Central Railway | - | R4, 99/233 | WRD | Otago | S | 24370 |
Kokonga | - | - | - | 31/7/1941 | It has been decided to install electric lighting in the following dwellings: Nos 162, 179, and 228. | Otago Central Railway | - | R4, 99/233 | WRD | Otago | S | 24371 |
Kokonga | - | - | - | 30/6/1960 | Fire in station building. | Otago Central Railway | - | W2382, 039 | WRD | Otago | S | 24372 |
Kokonga | - | - | - | 25/3/1963 | Mileage 73 miles 30 chains from Dunedin. | Otago Central Railway | - | W 3337 | WRD | Otago | S | 24373 |
Kokonga | - | - | - | 11/4/1967 | House No 162 sold for removal. | Otago Central Railway | - | R4, 98/2726 | WRD | Otago | S | 24374 |
Kokonga | - | - | - | 6/12/1981 | Closed to all traffic. Crossing loop and service siding retained meantime. | Otago Central Railway | - | W 3337 | WRD | Otago | S | 24375 |
Kokonga | - | - | - | 6/2/1988 | Small building with telephone. | Otago Central Railway | - | JRS/P231 | ATL | Otago | S | 24376 |
Kokonga | - | - | - | 1/10/1897 | Kokonga ballast pit siding leaves main line at 66 miles 14 chains, or about 6 chains from Kokonga terminus at 66 miles 20 chains. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24377 |
Kokonga | - | - | - | 1/10/1897 | Station – accommodation required for maintenance staff. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24378 |
Kokonga | - | - | - | 1/2/1897 | Re: date of opening Railway to Kokonga. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24379 |
Kokonga | - | - | - | 1/8/1898 | Accommodation shelter shed with ladies waiting room, passenger platform, cart approach to platform, loading bank, goods shed 40ft x 30ft, cattle yards, crane, water service, urinals. | Otago Central Railway | - | R4, 98/2756 | WRD | Otago | S | 24380 |
Kokonga | - | - | - | 1/8/1898 | Loop 23 wagons, loop 18 wagons (goods shed), backshunt ? Wagons (engine shed). | Otago Central Railway | - | R4, 98/2756 | WRD | Otago | S | 24381 |
Kokonga | - | - | - | 10/12/1898 | Kokonga to Ranfurly Section – Certificate of Inspection. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24382 |
Kokonga | - | - | - | 11/4/1899 | Kokonga station water supply – forwarding deed. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24383 |
Kokonga | - | - | - | 12/12/1898 | Line from Kokonga to Ranfurly has been open for traffic since 1st instant. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24384 |
Kokonga | - | - | - | 14/10/1897 | There is an engine shed at Kokonga for the use of the Public Works engine and the ballast pit siding leaves the main line in the Kokonga station yard. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24385 |
Kokonga | - | - | - | 14/10/1897 | Timber front platform, 7th class station. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24386 |
Kokonga | - | - | - | 17/11/1898 | Opening of section Kokonga to Ranfurly on 1st December. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24387 |
Kokonga | - | - | - | 17/8/1897 | Date of opening Hyde to Kokonga. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24388 |
Kokonga | - | - | - | 21/9/1897 | Application to erect dining and refreshment rooms. | Otago Central Railway | - | W 1820 | WRD | Otago | S | 24389 |
Kokonga | - | - | - | 24/10/1898 | Working goods traffic on unopened line between Kokonga and Waipiata. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24390 |
Kokonga | - | - | - | 25/10/1897 | Requisition for equipment for station. | Otago Central Railway | - | W 1820 | WRD | Otago | S | 24391 |
Kokonga | - | - | - | 25/6/1896 | Proposal to erect a platelayer's cottage. | Otago Central Railway | - | W 1820 | WRD | Otago | S | 24392 |
Kokonga | - | - | - | 26/5/1897 | Station buildings – requesting authority £14.14.8. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24393 |
Kokonga | - | - | - | 27/1/1899 | Approval to provide houses at Hyde, Kokonga, and Ranfurly with extra 400 gallon tanks and washing boilers built in coal sheds (PWD Drawing 6598). | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24394 |
Kokonga | - | - | - | 28/9/1897 | Hyde – Kokonga Section – Certificate of Inspection. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24395 |
Kokonga | - | - | - | 28/9/1898 | Gravitation water supply to railway station – forwarding tracing. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24396 |
Kokonga | - | - | - | 3/12/1898 | Opening of the Kokonga – Ranfurly Section – Certificate of Inspection. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24397 |
Kokonga | - | - | - | 3/5/1897 | Station buildings cost of labour and material – requesting authority £199.18.4. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24398 |
Kokonga | - | - | - | 3/9/1897 | Station buildings – timber supply contract – final certificate. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24399 |
Kokonga | - | - | - | 3/9/1898 | Goods traffic on unopened line between Kokonga and Waipiata. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24400 |
Kokonga | - | - | - | 30/10/1897 | Accommodation shelter shed (right side of line), passenger platform (right side of line), privies and urinals, goods shed 40ft x 30ft, sheep and cattle yards, outside loading platform (40ft x 15ft), temporary water supply. | Otago Central Railway | - | 00/2107/1 | WRD | Otago | S | 24401 |
Kokonga | - | - | - | 30/10/1897 | Loop 16 chains long, loop 10 chains long (both on left side) | Otago Central Railway | - | 00/2107/1 | WRD | Otago | S | 24402 |
Kokonga | - | - | - | 30/10/1897 | The Hyde to Kokonga Section was opened on the 18th instant. Kokonga station is 63 miles 60 chains from Wingatui Junction. | Otago Central Railway | - | 00/2107/1 | WRD | Otago | S | 24403 |
Kokonga | - | - | - | 30/11/1898 | Kokonga to Ranfurly will be opened on 1/12/1898. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24404 |
Kokonga | - | - | - | 30/4/1897 | Station buildings – timber supply – schedule of tenders. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24405 |
Kokonga | - | - | - | 4/10/1897 | Water supply at Kokonga is gravitation to four tanks, on left side. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24406 |
Kokonga | - | - | - | 7/1/1899 | 5-ton steam crane to be removed from Kokonga to Ranfurly. | Otago Central Railway | - | R4, 98/3691 | WRD | Otago | S | 24407 |
Kokonga | - | - | - | 7/10/1897 | Platelaying and ballasting Hyde to Kokonga – requesting authority £573. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24408 |
Kokonga | - | - | - | 8/9/1897 | Mr Cahill's application to put up a temporary iron building. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24409 |
Kokonga | - | - | - | 9/12/1897 | Fencing water tanks, etc., requesting authority £165. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24410 |
Kokonga | - | - | - | 9/7/1897 | Conveyance of goods Hyde to Kokonga. | Otago Central Railway | - | W 3 | PWD | Otago | S | 24411 |