File Records:Kokonga

From Railway Knowledge Base for New Zealand
Revision as of 06:56, 6 February 2022 by Robert (talk | contribs) (Initial Data Input)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Tiroiti Kokonga Waipiata
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Tiroiti--Kokonga Kokonga--Waipiata
7.7km 10.1km

Go to Kokonga on the Network Diagram



Name Alternative Name 1 Alternative Name 2 Alternative Name 3 Date Details Railway Railway 2 Reference Source Locality Island Sequence
Kokonga - - - 20/8/1900 Clearance of cattle yards. Otago Central Railway - W3734/15 WRD Otago S 24367
Kokonga - - - 6/12/1909 Automatic tablet exchanger apparatus provided. Otago Central Railway - W3337 WRD Otago S 24368
Kokonga - - - 14/5/1915 Telephone connection. Otago Central Railway - W3734/32 WRD Otago S 24369
Kokonga - - - 14/7/1938 Authority to provide bathroom in House No 179. Otago Central Railway - R4, 99/233 WRD Otago S 24370
Kokonga - - - 31/7/1941 It has been decided to install electric lighting in the following dwellings: Nos 162, 179, and 228. Otago Central Railway - R4, 99/233 WRD Otago S 24371
Kokonga - - - 30/6/1960 Fire in station building. Otago Central Railway - W2382, 039 WRD Otago S 24372
Kokonga - - - 25/3/1963 Mileage 73 miles 30 chains from Dunedin. Otago Central Railway - W 3337 WRD Otago S 24373
Kokonga - - - 11/4/1967 House No 162 sold for removal. Otago Central Railway - R4, 98/2726 WRD Otago S 24374
Kokonga - - - 6/12/1981 Closed to all traffic. Crossing loop and service siding retained meantime. Otago Central Railway - W 3337 WRD Otago S 24375
Kokonga - - - 6/2/1988 Small building with telephone. Otago Central Railway - JRS/P231 ATL Otago S 24376
Kokonga - - - 1/10/1897 Kokonga ballast pit siding leaves main line at 66 miles 14 chains, or about 6 chains from Kokonga terminus at 66 miles 20 chains. Otago Central Railway - R4, 98/3691 WRD Otago S 24377
Kokonga - - - 1/10/1897 Station – accommodation required for maintenance staff. Otago Central Railway - W 3 PWD Otago S 24378
Kokonga - - - 1/2/1897 Re: date of opening Railway to Kokonga. Otago Central Railway - W 3 PWD Otago S 24379
Kokonga - - - 1/8/1898 Accommodation shelter shed with ladies waiting room, passenger platform, cart approach to platform, loading bank, goods shed 40ft x 30ft, cattle yards, crane, water service, urinals. Otago Central Railway - R4, 98/2756 WRD Otago S 24380
Kokonga - - - 1/8/1898 Loop 23 wagons, loop 18 wagons (goods shed), backshunt ? Wagons (engine shed). Otago Central Railway - R4, 98/2756 WRD Otago S 24381
Kokonga - - - 10/12/1898 Kokonga to Ranfurly Section – Certificate of Inspection. Otago Central Railway - R4, 98/3691 WRD Otago S 24382
Kokonga - - - 11/4/1899 Kokonga station water supply – forwarding deed. Otago Central Railway - W 3 PWD Otago S 24383
Kokonga - - - 12/12/1898 Line from Kokonga to Ranfurly has been open for traffic since 1st instant. Otago Central Railway - R4, 98/3691 WRD Otago S 24384
Kokonga - - - 14/10/1897 There is an engine shed at Kokonga for the use of the Public Works engine and the ballast pit siding leaves the main line in the Kokonga station yard. Otago Central Railway - R4, 98/3691 WRD Otago S 24385
Kokonga - - - 14/10/1897 Timber front platform, 7th class station. Otago Central Railway - R4, 98/3691 WRD Otago S 24386
Kokonga - - - 17/11/1898 Opening of section Kokonga to Ranfurly on 1st December. Otago Central Railway - W 3 PWD Otago S 24387
Kokonga - - - 17/8/1897 Date of opening Hyde to Kokonga. Otago Central Railway - W 3 PWD Otago S 24388
Kokonga - - - 21/9/1897 Application to erect dining and refreshment rooms. Otago Central Railway - W 1820 WRD Otago S 24389
Kokonga - - - 24/10/1898 Working goods traffic on unopened line between Kokonga and Waipiata. Otago Central Railway - W 3 PWD Otago S 24390
Kokonga - - - 25/10/1897 Requisition for equipment for station. Otago Central Railway - W 1820 WRD Otago S 24391
Kokonga - - - 25/6/1896 Proposal to erect a platelayer's cottage. Otago Central Railway - W 1820 WRD Otago S 24392
Kokonga - - - 26/5/1897 Station buildings – requesting authority £14.14.8. Otago Central Railway - W 3 PWD Otago S 24393
Kokonga - - - 27/1/1899 Approval to provide houses at Hyde, Kokonga, and Ranfurly with extra 400 gallon tanks and washing boilers built in coal sheds (PWD Drawing 6598). Otago Central Railway - R4, 98/3691 WRD Otago S 24394
Kokonga - - - 28/9/1897 Hyde – Kokonga Section – Certificate of Inspection. Otago Central Railway - R4, 98/3691 WRD Otago S 24395
Kokonga - - - 28/9/1898 Gravitation water supply to railway station – forwarding tracing. Otago Central Railway - W 3 PWD Otago S 24396
Kokonga - - - 3/12/1898 Opening of the Kokonga – Ranfurly Section – Certificate of Inspection. Otago Central Railway - W 3 PWD Otago S 24397
Kokonga - - - 3/5/1897 Station buildings cost of labour and material – requesting authority £199.18.4. Otago Central Railway - W 3 PWD Otago S 24398
Kokonga - - - 3/9/1897 Station buildings – timber supply contract – final certificate. Otago Central Railway - W 3 PWD Otago S 24399
Kokonga - - - 3/9/1898 Goods traffic on unopened line between Kokonga and Waipiata. Otago Central Railway - W 3 PWD Otago S 24400
Kokonga - - - 30/10/1897 Accommodation shelter shed (right side of line), passenger platform (right side of line), privies and urinals, goods shed 40ft x 30ft, sheep and cattle yards, outside loading platform (40ft x 15ft), temporary water supply. Otago Central Railway - 00/2107/1 WRD Otago S 24401
Kokonga - - - 30/10/1897 Loop 16 chains long, loop 10 chains long (both on left side) Otago Central Railway - 00/2107/1 WRD Otago S 24402
Kokonga - - - 30/10/1897 The Hyde to Kokonga Section was opened on the 18th instant. Kokonga station is 63 miles 60 chains from Wingatui Junction. Otago Central Railway - 00/2107/1 WRD Otago S 24403
Kokonga - - - 30/11/1898 Kokonga to Ranfurly will be opened on 1/12/1898. Otago Central Railway - R4, 98/3691 WRD Otago S 24404
Kokonga - - - 30/4/1897 Station buildings – timber supply – schedule of tenders. Otago Central Railway - W 3 PWD Otago S 24405
Kokonga - - - 4/10/1897 Water supply at Kokonga is gravitation to four tanks, on left side. Otago Central Railway - R4, 98/3691 WRD Otago S 24406
Kokonga - - - 7/1/1899 5-ton steam crane to be removed from Kokonga to Ranfurly. Otago Central Railway - R4, 98/3691 WRD Otago S 24407
Kokonga - - - 7/10/1897 Platelaying and ballasting Hyde to Kokonga – requesting authority £573. Otago Central Railway - W 3 PWD Otago S 24408
Kokonga - - - 8/9/1897 Mr Cahill's application to put up a temporary iron building. Otago Central Railway - W 3 PWD Otago S 24409
Kokonga - - - 9/12/1897 Fencing water tanks, etc., requesting authority £165. Otago Central Railway - W 3 PWD Otago S 24410
Kokonga - - - 9/7/1897 Conveyance of goods Hyde to Kokonga. Otago Central Railway - W 3 PWD Otago S 24411