File Records:Omihi

From Railway Knowledge Base for New Zealand
Revision as of 09:28, 1 February 2022 by Robert (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Waipara Omihi Spye
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Waipara--Omihi Omihi--Spye
9.4km 4.7km

Go to Omihi on the Network Diagram



Omihi - - - 12/1900 Block plan of Omihi station yard. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39077
Omihi - - - 15/2/1901 Arrangement for Omihi station. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39078
Omihi - - - 29/5/1901 Ballasting Omihi Section. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39079
Omihi - - - 25/11/1901 Carrying goods to Omihi station by ballast train. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39080
Omihi - - - 20/12/1901 Conveyance of private goods over Omihi Section. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39081
Omihi - - - 20/1/1902 Omihi and Skargill stations – equipment - £1,500. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39082
Omihi - - - 31/3/1903 Omihi Section. Platelayer's cottages.  Contract let to J P Petersen, Invercargill, amount £1,495.0.0. Blenheim – Waipara Railway - W 34/1 PWD Canterbury S 39083
Omihi - - - 31/7/1903 Above contract completed. Blenheim – Waipara Railway - W 34/1 PWD Canterbury S 39084
Omihi - - - 30/11/1903 Hand pumps required for windmills erected at Omihi and Scargill.  Estimate £88. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39085
Omihi - - - 22/4/1904 Pumps for water service at Omihi and Scargill – requesting authority £90. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39086
Omihi - - - 28/4/1904 Erection of sheds for hand pumps, etc, at Omihi and Scargill.  Requesting authority £40. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39087
Omihi - - - 11/8/1905 Approach road to station, metalling.  Requesting authority £72.10.0. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39088
Omihi - - - 2/2/1907 Road near Omihi – whether Department will vest this in local authorities. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39089
Omihi - - - 8/2/1908 Road near Omihi – requesting authority £100 to put this in order. Blenheim – Waipara Railway - W 3 PWD Canterbury S 39090
Omihi - - - 1/4/1910 Application for erection of verandah on goods shed. Blenheim – Waipara Railway - W3734/27 WRD Canterbury S 39091
Omihi - - - 31/3/1949 Provision of additional stockyards and siding completed. Blenheim – Waipara Railway - W2854, Pub 31/5 WRD Canterbury S 39092
Omihi - - - 30/3/1951 Caretaker at station. Blenheim – Waipara Railway - R4, 99/290 WRD Canterbury S 39093
Omihi - - - 19/11/1957 Fire destroyed the station lavatory, track gang tool shed, a shelter shed and a trolly shed. Blenheim – Waipara Railway - W2382, 039 WRD Canterbury S 39094
Omihi - - - 19/11/1957 Station building destroyed by fire. Blenheim – Waipara Railway - W2382, 039 WRD Canterbury S 39095
Omihi - - - 28/10/1958 A line gang shelter and tool shed has been placed at Omihi to replace station building destroyed. Blenheim – Waipara Railway - W2382, 039 WRD Canterbury S 39096
Omihi - - - 2/10/1960 Mileage 46 miles 23 chains from Christchurch. Blenheim – Waipara Railway - W 3337 WRD Canterbury S 39097
Omihi - - - 25/5/1969 Station building and platform, goods shed, low-level loading bank, high-level loading bank, and cattle and sheep yards. Blenheim – Waipara Railway - W 3337 WRD Canterbury S 39098
Omihi - - - 5/7/1981 Closed to all traffic but loop retained for train crossing. Blenheim – Waipara Railway - W 3337 WRD Canterbury S 39099
Omihi - - - 2/11/1987 Main North Line – 72.19km from Addington (0.00km). Blenheim – Waipara Railway - W 3337 WRD Canterbury S 39100
Omihi - - - 25/11/1988 Still used for timetabled running of trains. Blenheim – Waipara Railway - W 3337 WRD Canterbury S 39101