File Records:Rakautara
Jump to navigation
Jump to search
Maungamaunu | Rakautara | Pines | ||||||||||||||||||||||
Maungamaunu--Rakautara | Rakautara--Pines | |||||||||||||||||||||||
5.4km | 11.4km |
Go to Rakautara on the Network Diagram
Name | Alt 1 | Alt 2 | Alt 3 | Date | Details | Railway | Rly 2 | Reference | Source | Locality | Island | Sequence |
Rakautara | Aniseed | - | - | 3/1926 | Two platelayers' cottages – tender of S Bennett accepted, amount £1914.0.0. | Blenheim – Waipara Railway | - | W 34/2 | PWD | Marlborough | N | 48714 |
Rakautara | Aniseed | - | - | 28/9/1939 | The Geographic Board suggests changing the name of Aniseed station to Rakautara. [“Aniseed” still used beyond that date.] | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | N | 48715 |
Rakautara | Aniseed | - | - | 10/7/1940 | Formation work in yard practically completed, and to be put in hand shortly the construction of the loading bank and platform walls. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48716 |
Rakautara | Aniseed | - | - | 10/7/1940 | Mileage 86 miles 57 chains. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48717 |
Rakautara | Aniseed | - | - | 24/6/1942 | Aniseed – four permanent cottages have been completed. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | N | 48718 |
Rakautara | Aniseed | - | - | 9/2/1943 | Goods shed to be constructed to PWD Nelson Drawing 3480 (with the word “Aniseed” deleted). | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48719 |
Rakautara | Aniseed | - | - | 10/2/1943 | A start has been made on the goods shed by the Department and all piles are in place. Weatherboards are to be placed on the walls and corrugated fibrolite on the roof. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48720 |
Rakautara | Aniseed | - | - | 10/2/1943 | Aniseed – contract let for erection of a goods shed, 22 feet 6 inches by 20 feet, and a station shelter, 14 feet by 8 feet. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48721 |
Rakautara | Aniseed | - | - | 10/2/1943 | Some work already done on goods shed at Rakautara. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | N | 48722 |
Rakautara | Aniseed | - | - | 28/3/1943 | Contract for station buildings completed. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48723 |
Rakautara | Aniseed | - | - | 6/5/1943 | The Railways Department requisitioned to supply second-hand 70lb rails in suitable condition for verandah roof supports, bent to suit verandah. Four no required for Aniseed goods shed. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | N | 48724 |
Rakautara | Aniseed | - | - | 3/1944 | Rakautara and Hopuku station buildings – tender of N Caldwell accepted, amount £2964.0.0. | Blenheim – Waipara Railway | - | W 34/5 | PWD | Marlborough | N | 48725 |
Rakautara | Aniseed | - | - | 13/3/1944 | Station opened, 86 miles 12 chains from Picton. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | N | 48726 |
Rakautara | Aniseed | - | - | 11/8/1944 | Contract for station buildings to N Caldwell, Christchurch. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | N | 48727 |
Rakautara | Aniseed | - | - | 13/12/1945 | Mileage 86 miles 12 chains from Addington. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | N | 48728 |
Rakautara | Aniseed | - | - | 13/12/1945 | On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | N | 48729 |
Rakautara | Aniseed | - | - | 21/8/1948 | Shelter hut destroyed by fire. | Blenheim – Waipara Railway | - | W2382, 039 | WRD | Marlborough | N | 48730 |
Rakautara | Aniseed | - | - | 2/11/1987 | Main North Line – 209.35km from Addington (0.00km). | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | N | 48731 |
Rakautara | Aniseed | - | - | 25/11/1988 | Still used for timetabled running of trains. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | N | 48732 |
Rakautara | Aniseed | - | - | 2/10/1900 | Mileage 11 miles 74 chains from Kaikoura. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | N | 48733 |