File Records:Kekerengu
Jump to navigation
Jump to search
Parikawa | Kekerengu | Wharanui | ||||||||||||||||||||||
Parikawa--Kekerengu | Kekerengu--Wharanui | |||||||||||||||||||||||
10.1km | 9.3km |
Go to Kekerengu on the Network Diagram
Name | Alt 1 | Alt 2 | Alt 3 | Date | Details | Railway | Rly 2 | Reference | Source | Locality | Island | Sequence |
Kekerengu | Kekerengu | - | - | 1930 | Kekerengu station is at 62 miles 40 chains. To have sheep yards and a passenger platform. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23524 |
Kekerengu | Kekerengu | - | - | 11/8/1933 | Kekerengu – work abandoned. Overbridge was to be built but only the spoil bank was completed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23525 |
Kekerengu | Kekerengu | - | - | 3/3/1936 | Work on the station yard at Kekerengu was started in 6/1929 and closed down on 29/10/1931. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23526 |
Kekerengu | Kekerengu | - | - | 23/6/1936 | Prime Minister announces start to be made to complete the line. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23527 |
Kekerengu | Kekerengu | - | - | 11/10/1937 | Station arrangement approved. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23528 |
Kekerengu | Kekerengu | - | - | 15/10/1937 | The station yard at Kekerengu has yet to be formed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23529 |
Kekerengu | Kekerengu | - | - | 18/10/1937 | Mileage 62 miles 70 chains. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23530 |
Kekerengu | Kekerengu | - | - | 14/10/1938 | Buildings required at Kekerengu: station building (14ft x 8ft, PWD Drawing 8848), goods shed (30ft x 20ft), four staff houses. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | S | 23531 |
Kekerengu | Kekerengu | - | - | 5/7/1939 | Standard drawing 8848 shelter shed and one extra house to be provided (house at Kekerengu instead of at Parikawa). | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23532 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Five platelayers' cottages – Drawing 50976 (NZR), 98947 (PWD). | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23533 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Goods shed, 30ft x 20ft – Drawing 55784 (PWD); | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23534 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Latrine, 2 stall – Drawing 43012; | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23535 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Proposing to let a contract for the following at Kekerengu: | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23536 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Shelter shed, 14ft x 8ft; | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23537 |
Kekerengu | Kekerengu | - | - | 5/5/1941 | Contractor for station buildings is D Wemyss of Blenheim. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23538 |
Kekerengu | Kekerengu | - | - | 24/6/1942 | Kekerengu – five permanent cottages are under construction here and one nearly completed. This requires painting and papering. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23539 |
Kekerengu | Kekerengu | - | - | 31/7/1951 | Spelling of station name changed from Kekerengu to Kekerengu. | Blenheim – Waipara Railway | - | R-W3, 14545 | WRD | Marlborough | S | 23540 |
Kekerengu | Kekerengu | - | - | 2/10/1960 | Mileage 35 miles 9 chains from Kaikoura. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23541 |
Kekerengu | Kekerengu | - | - | 29/3/1981 | Closed to all traffic except in wagon lots. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23542 |
Kekerengu | Kekerengu | - | - | 9/2/1988 | Shelter shed. | Blenheim – Waipara Railway | - | JRS/P227 | ATL | Marlborough | S | 23543 |
Kekerengu | Kekerengu | - | - | 0/01/1900 | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23544 | |
Kekerengu | Kekerengu | - | - | 1/9/1938 | To be provided at Kekerengu: shelter shed (14ft x 10ft), platform (200ft), loading bank, stockyards, 4 platelayers' cottages, 6,000 gallon vat and stand, water supply. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23545 |
Kekerengu | Kekerengu | - | - | 19/12/1942 | Station opened, 62 miles 78 chains from Picton. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 23546 |
Kekerengu | Kekerengu | - | - | 13/12/1945 | Mileage 62 miles 78 chains from Addington. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | S | 23547 |
Kekerengu | Kekerengu | - | - | 13/12/1945 | On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | S | 23548 |
Kekerengu | Kekerengu | - | - | 29/11/1949 | Spelling of station name altered from Kekerengu to Kekerengu in 5/1948. | Blenheim – Waipara Railway | - | W3199, 00/2107/1 | WRD | Marlborough | S | 23549 |
Kekerengu | Kekerengu | - | - | 31/7/1951 | Spelling of station name changed from Kekerengu to Kekerengu. | Blenheim – Waipara Railway | - | R-W3, 14545 | WRD | Marlborough | S | 23550 |
Kekerengu | Kekerengu | - | - | 25/11/1988 | Still used for timetabled running of trains. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23551 |
Parikawa | Kekerengu | Wharanui | ||||||||||||||||||||||
Parikawa - Kekerengu | Kekerengu - Wharanui | |||||||||||||||||||||||
{{{Prev_Dist}}} | {{{Next_Dist}}} |