File Records:St Andrews

From Railway Knowledge Base for New Zealand
Revision as of 08:51, 27 January 2022 by Robert (talk | contribs) (i)
Jump to navigation Jump to search
Pareora St Andrews Otaio
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Pareora - St_Andrews St_Andrews - Otaio
6.2km 4.9km

Go to St Andrews on the Network Diagram



St Andrews - - - 17/12/1909 Automatic tablet exchanger apparatus provided. Timaru – Oamaru Section - W3337 WRD Canterbury S 53399
St Andrews - - - 17/12/1909 Automatic tablet exchanger apparatus provided. Timaru – Oamaru Section - W3337 WRD Canterbury S 53400
St Andrews - - - 13/7/1908 Petition for the provision of a water supply. Timaru Section - W3734/24 WRD Canterbury S 53401
St Andrews - - - 13/12/1926 Authority for £220 for extension of stockyard siding. Timaru Section - W3199, 03/2306 WRD Canterbury S 53402
St Andrews - - - 12/2/1965 New type of tablet exchanger installed 6/1963, since removed. Timaru Section - W5514, 09/2223/1 WRD Canterbury S 53403
St Andrews - - - 28/10/1973 Closed to all traffic. Timaru Section - W3180, Pub 3 WRD Canterbury S 53404
St Andrews - - - 2/11/1987 Main South Line – 187.40km from Port Lyttelton (0.00km). Timaru Section - W 3337 WRD Canterbury S 53405
St Andrews - - - 1/5/1879 Loop 20 wagons Timaru Section - W 3337 WRD Canterbury S 53406
St Andrews - - - 1/7/1876 Timaru – St Andrews opened for traffic. Timaru Section - W3180, Pub 1/12 WRD Canterbury S 53407
St Andrews - - - 1/8/1898 Accommodation 5th class station, passenger platform, cart approach to platform, goods shed 60ft x 30ft, loading bank, cattle yards, stationmaster's house, urinals. Timaru Section - R4, 98/2756 WRD Canterbury S 53408
St Andrews - - - 1/8/1898 Loop 16 wagons, loop 16 wagons, backshunt 18 wagons. Timaru Section - R4, 98/2756 WRD Canterbury S 53409
St Andrews - - - 1/9/1882 Accommodation 5th class station, passenger platform, cart approach to platform, goods shed 60ft x 30ft, stationmaster's house, urinals. Timaru Section - W 3337 WRD Canterbury S 53410
St Andrews - - - 1/9/1882 Loop 25 wagons Timaru Section - W 3337 WRD Canterbury S 53411
St Andrews - - - 12/12/1881 Loop 25 wagons Timaru Section - W 3337 WRD Canterbury S 53412
St Andrews - - - 15/10/1879 Loop 20 wagons Timaru Section - W 3337 WRD Canterbury S 53413
St Andrews - - - 19/4/1886 Accommodation 5th class station, passenger platform, cart approach to platform, cattle yards, goods shed 60ft x 30ft, stationmaster's house, urinals. Timaru Section - W 3337 WRD Canterbury S 53414
St Andrews - - - 19/4/1886 Loop 16 wagons, loop 16 wagons, backshunt 18 wagons Timaru Section - W 3337 WRD Canterbury S 53415
St Andrews 4/2/1904 Old Kaiapoi station removed to St Andrews and re-erected as a dwelling. S 53416
St Andrew's - - - 25/7/1900 Siding accommodation at St Andrews. Timaru Section - W3734/15 WRD Canterbury S 53417
St Andrew's - - - 9/8/1900 Authority for £55 for siding extension. Timaru Section - W3199, 10/2868 WRD Canterbury S 53418
St Andrew's - - - 9/8/1900 Shed road which at present holds 15 wagons is to be lengthened so as to take 25 wagons. Timaru Section - W3199, 10/2868 WRD Canterbury S 53419
St Andrew's - - - 22/1/1901 Burglary at station. Timaru Section - W3734/16 WRD Canterbury S 53420
St Andrew's - - - 27/2/1901 Improvements to station building. Timaru Section - W3734/16 WRD Canterbury S 53421
St Andrew's - - - 7/8/1901 The Waimate County Council have given approval for encroachment on to public road, thereby enabling the Telegraph Office to be enlarged (addition of a telephone box). Timaru Section - W3199, 10/2868 WRD Canterbury S 53422
St Andrew's - - - 13/8/1901 Work has now been put in hand enlarging the Telegraph Office. Timaru Section - W3199, 10/2868 WRD Canterbury S 53423
St Andrew's - - - 1890 Mileage 10 miles 28 chains from Timaru. Timaru Section - R4, 90/2780 WRD Canterbury S 53424
St Andrew's - - - 8/6/1908 Station is a lean-to type of building. Timaru Section - W3199, 10/2868 WRD Canterbury S 53425
St Andrew's - - - 8/6/1908 The District Traffic Manager, Christchurch, should indent for the Rochester lamps to light the platform. Timaru Section - W3199, 10/2868 WRD Canterbury S 53426
St Andrew's - - - 8/6/1908 There is only one lamp on platform, and this is of the old obsolete flat wick description giving little light.  Should be replaced by three Rochester lamps. Timaru Section - W3199, 10/2868 WRD Canterbury S 53427
St Andrew's - - - 20/6/1910 Application for increasing loading bank. Timaru Section - W3734/27 WRD Canterbury S 53428
St Andrew's - - - 13/7/1911 Erection of verandah approved. Timaru Section - W3199, 10/2868 WRD Canterbury S 53429
St Andrew's - - - 13/7/1911 Renewal of the cattle yards and their removal to a new site approved. Timaru Section - W3199, 10/2868 WRD Canterbury S 53430
St Andrew's - - - 3/8/1911 Authority for £75 for verandah. Timaru Section - W3199, 10/2868 WRD Canterbury S 53431
St Andrew's - - - 15/11/1911 Length of station building on platform side – 60 feet 7 inches. Timaru Section - W3199, 10/2868 WRD Canterbury S 53432
St Andrew's - - - 15/11/1911 Proposed addition to station building approved, estimated cost £20. Timaru Section - W3199, 10/2868 WRD Canterbury S 53433
St Andrew's - - - 15/11/1911 Width of extension at back of station building – 4 feet 4 inches. Timaru Section - W3199, 10/2868 WRD Canterbury S 53434
St Andrew's - - - 15/11/1911 Width of ladies conveniences, etc – 7 feet 2 inches. Timaru Section - W3199, 10/2868 WRD Canterbury S 53435
St Andrew's - - - 15/11/1911 Width of main part of station building – 12 feet 9 inches. Timaru Section - W3199, 10/2868 WRD Canterbury S 53436
St Andrew's - - - 28/5/1913 Cost of extending the sidings so as to give standing room and loading accommodation up to road line, will be about £240. Timaru Section - W3199, 10/2868 WRD Canterbury S 53437
St Andrew's - - - 8/7/1913 Instructions have been given for some four chains post and wire leading fences to be rebuilt with heavy wire netting similar to that used for the holding yards, and also for two portable discharging races, long enough to suit upper decks of sheep wagons, to be provided. Timaru Section - W3199, 10/2868 WRD Canterbury S 53438
St Andrew's - - - 8/7/1913 This is to improve facilities for dealing with sheep traffic at the station. Timaru Section - W3199, 10/2868 WRD Canterbury S 53439
St Andrew's - - - 9/7/1913 Authority for £35 for stock loading facilities. Timaru Section - W3199, 10/2868 WRD Canterbury S 53440
St Andrew's - - - 24/11/1917 Authority for £37.10.0 for improved office accommodation (to be extended 10 feet).  Half cost – other half to be charged to Postal Department. Timaru Section - W3199, 10/2868 WRD Canterbury S 53441
St Andrew's - - - 18/1/1918 Telephone bureau box to be made sound proof, estimated cost £7.10.0. Timaru Section - W3199, 10/2868 WRD Canterbury S 53442
St Andrew's - - - 12/4/1920 Damage to railway premises and goods shed. Timaru Section - W3734/36 WRD Canterbury S 53443
St Andrew's - - - 11/2/1921 Posting boxes to be set in about 2 feet from the face of the wall, approved, estimated cost  £6. Timaru Section - W3199, 10/2868 WRD Canterbury S 53444
St Andrew's - - - 17/3/1922 Posting boxes to be removed to the street side of the station building, to avoid the need for users to go on to the platform. Timaru Section - W3199, 10/2868 WRD Canterbury S 53445
St Andrew's - - - 19/3/1925 Post Office removed from station. Timaru Section - Mails by Rail in NZ R Startup Canterbury S 53446
St Andrew's - - - 13/12/1926 Extension of stockyards siding approved, estimated cost £220. Timaru Section - W3199, 10/2868 WRD Canterbury S 53447
St Andrew's - - - 7/2/1927 Authority for £305 for extension of stockyards siding, connecting to main line. Timaru Section - W3199, 10/2868 WRD Canterbury S 53448
St Andrew's - - - 7/2/1927 Conversion of backshunt to a loop, extension of crossing loop. Timaru Section - W3199, 10/2868 WRD Canterbury S 53449
St Andrew's - - - 15/6/1928 Proposing to shift 30cwt crane from St Andrews to Burnside. Timaru Section - W3199, 10/2868 WRD Canterbury S 53450
St Andrew's - - - 18/6/1928 Approval to shift the 30cwt crane from St Andrews to Burnside. Timaru Section - W3199, 03/1480 WRD Canterbury S 53451
St Andrew's - - - 28/6/1928 Authority for £40 to shift 30cwt crane from St Andrews to Burnside. Timaru Section - W3199, 03/1480 WRD Canterbury S 53452
St Andrew's - - - 1/10/1928 Second loading bank to be 50 feet south of the goods shed and 75 feet north of the existing loading bank. Timaru Section - W3199, 10/2868 WRD Canterbury S 53453
St Andrew's - - - 2/11/1928 Providing an additional loading bank approved, estimated cost £80. Timaru Section - W3199, 10/2868 WRD Canterbury S 53454
St Andrew's - - - 10/4/1953 Authority for £240 for concreting two holding yards of the stockyards. Timaru Section - W3199, 10/2868 WRD Canterbury S 53455
St Andrew's - - - 4/4/1955 The erection of a race for loading sheep and cattle to and from road vehicles approved, at an estimated cost of £200. Timaru Section - W3199, 10/2868 WRD Canterbury S 53456
St Andrew's - - - 10/1962 Little River bell went to St Andrews. Timaru Section - W 4098, 03/663 WRD Canterbury S 53457
St Andrew's - - - 15/12/1965 Extension of crossing loop to hold 130 wagons approved, estimated cost £2550.  Loop currently holds 68 wagons. Timaru Section - W3199, 10/2868 WRD Canterbury S 53458
St Andrew's - - - 15/12/1965 South turnout to be shifted to 116 miles 50 chains 58 links. Timaru Section - W3199, 10/2868 WRD Canterbury S 53459
St Andrew's - - - 14/4/1966 A new Up distant signal of the two-position colour light type will be placed and brought into use on the same side of the main line as the present Up distant semaphore signal, 621 yards further south. Timaru Section - W3199, 10/2868 WRD Canterbury S 53460
St Andrew's - - - 14/4/1966 On Tuesday, 26/4/1966, the Up distant, Up main, and Up home signals will be taken out of use. Timaru Section - W3199, 10/2868 WRD Canterbury S 53461
St Andrew's - - - 14/4/1966 The Up main and the Up home semaphore signals will be resited and brought into use on the same side of the line as the present signals, 381 yards further south. Timaru Section - W3199, 10/2868 WRD Canterbury S 53462
St Andrew's - - - 23/8/1966 Crossing loop, goods shed loop, stockyards backshunt (south end). Timaru Section - W3199, 10/2868 WRD Canterbury S 53463
St Andrew's - - - 23/8/1966 Station building, passenger platform, access road to goods yard, goods shed, 2 No loading banks, stockyards. Timaru Section - W3199, 10/2868 WRD Canterbury S 53464
St Andrew's - - - 3/9/1969 Closing of the stockyards approved.  To be sold for removal by tender. Timaru Section - W3199, 10/2868 WRD Canterbury S 53465
St Andrew's - - - 22/6/1970 The stockyards have been removed recently and there is now no further use for the crossovers. Timaru Section - W3199, 10/2868 WRD Canterbury S 53466
St Andrew's - - - 22/6/1970 The two crossovers in the yard between the crossing loop and the goods shed were provided to facilitate shunting of the yard when stock was handled there. Timaru Section - W3199, 10/2868 WRD Canterbury S 53467
St Andrew's - - - 9/7/1970 The removal of the two crossovers in yard approved. Timaru Section - W3199, 10/2868 WRD Canterbury S 53468
St Andrew's - - - 14/5/1971 The bell at St Andrews was transferred from Southbridge when that station was closed. Timaru Section - W 4098, 03/663 WRD Canterbury S 53469
St Andrew's - - - 13/12/1971 - estimated cost to National Roads Board - $1,995 Timaru Section - W 2493, 96/1074 WRD Canterbury S 53470
St Andrew's - - - 13/12/1971 - estimated cost to Railways Department - $1,995 Timaru Section - W 2493, 96/1074 WRD Canterbury S 53471
St Andrew's - - - 13/12/1971 - total cost of installation - $3,900 Timaru Section - W 2493, 96/1074 WRD Canterbury S 53472
St Andrew's - - - 13/12/1971 Authority for $1,995 to install flashing lights and bell alarms at St Andrews level crossing at 116 miles 8 chains, Main South Line. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53473
St Andrew's - - - 20/12/1971 Approval for the above. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53474
St Andrew's - - - 14/6/1972 Construct a new connection from the loop to the shed road at north end.  This turnout is positioned to allow for 15 wagon headroom on the loop. Timaru Section - W3199, 10/2868 WRD Canterbury S 53475
St Andrew's - - - 14/6/1972 Construct a new low-level loading bank, 42 feet in length, south of the proposed goods shed. Timaru Section - W3199, 10/2868 WRD Canterbury S 53476
St Andrew's - - - 14/6/1972 Crossing loop, goods shed loop. Timaru Section - W3199, 10/2868 WRD Canterbury S 53477
St Andrew's - - - 14/6/1972 Extend crossing loop at south end by 14 chains. Timaru Section - W3199, 10/2868 WRD Canterbury S 53478
St Andrew's - - - 14/6/1972 Proposing to extend crossing loop to accommodate 160 wagons in conjunction with yar and signalling alterations. Timaru Section - W3199, 10/2868 WRD Canterbury S 53479
St Andrew's - - - 14/6/1972 Remove existing loop to she road turnout, along with 8 chains of track. Timaru Section - W3199, 10/2868 WRD Canterbury S 53480
St Andrew's - - - 14/6/1972 Remove goods shed and from material recovered, construct a new goods shed 15 feet by 15 feet south of the present goods shed. Timaru Section - W3199, 10/2868 WRD Canterbury S 53481
St Andrew's - - - 14/6/1972 Remove the two existing loading banks. Timaru Section - W3199, 10/2868 WRD Canterbury S 53482
St Andrew's - - - 8/1972 The alarms at St Andrews crossing operate automatically for all train movements controlled by fixed signals. Timaru Section - W3199, 10/2868 WRD Canterbury S 53483
St Andrew's - - - 14/3/1974 Small goods shed 15 feet by 15 feet erected in yard to handle ancillary parcels and small lots, etc. Timaru Section - W3199, 10/2868 WRD Canterbury S 53484
St Andrew's - - - 14/3/1974 Station building to be removed and passenger shelter to be provided. Timaru Section - W3199, 10/2868 WRD Canterbury S 53485
St Andrew's - - - 23/10/1980 Recommending St Andrews be retained as an unattended flag station.  Goods shed and track work are in good condition. Timaru Section - W3199, 10/2868 WRD Canterbury S 53486
St Andrew's - - - 1/10/1876 Post Office operated by Railways Department staff opened. Timaru Section - Mails by Rail in NZ R Startup Canterbury S 53487
St Andrew's - - - 1/5/1879 Mileage 10 miles 28 chains from Timaru. Timaru Section - W 3337 WRD Canterbury S 53488
St Andrew's - - - 10/4/1876 Recommending station near Otaio be called “St Andrews”. Timaru Section - W 3 PWD Canterbury S 53489
St Andrew's - - - 11/8/1883 Requesting authority £100 for the construction of cattle and sheep yards. Timaru Section - W 1820 WRD Canterbury S 53490
St Andrew's - - - 14/3/1896 Application of Waimate County Council for land for road purposes. Timaru Section - W 1820 WRD Canterbury S 53491
St Andrew's - - - 16/2/1882 Secretary, Marine Department – requesting light at St Andrews station may be masked so as not to shew seaward. Timaru Section - W 1820 WRD Canterbury S 53492
St Andrew's - - - 17/7/1895 Additions to ganger's house. Timaru Section - W 1820 WRD Canterbury S 53493
St Andrew's - - - 17/8/1882 Approval for ladies waiting room. Timaru Section - W3199, 10/2868 WRD Canterbury S 53494
St Andrew's - - - 18/7/1896 Recommends additions to stationmaster's house. Timaru Section - W 1820 WRD Canterbury S 53495
St Andrew's - - - 20/8/1883 Sheep yards are to be erected without delay. Timaru Section - W3199, 10/2868 WRD Canterbury S 53496
St Andrew's - - - 21/2/1887 Petition asking for level crossing south end of station. Timaru Section - W 1820 WRD Canterbury S 53497
St Andrew's - - - 23/3/1887 Petition asking for level crossing south end of station. Timaru Section - W 1820 WRD Canterbury S 53498
St Andrew's - - - 24/1/1883 Ladies waiting room will be completed in about three weeks, if not sooner. Timaru Section - W3199, 10/2868 WRD Canterbury S 53499
St Andrew's - - - 25/7/1876 Line to St Andrews now open. Timaru Section - AJHR, 1876 ATL Canterbury S 53500
St Andrew's - - - 26/3/1885 Postal Department – stating that Postal name for St Andrews is St Andrew. Timaru Section - W 1820 WRD Canterbury S 53501
St Andrew's - - - 26/7/1899 Domain Board's application for a foot crossing. Timaru Section - W3734/15 WRD Canterbury S 53502
St Andrew's - - - 28/6/1899 Appointment of cadet for delivery of telegrams. Timaru Section - W3734/15 WRD Canterbury S 53503
St Andrew's - - - 29/12/1879 Application of New Zealand & Land Agency for a siding at St Andrews.  Cost £425. Timaru Section - W 1820 WRD Canterbury S 53504
St Andrew's - - - 29/8/1898 As to lengthening loading platform. Timaru Section - W3734/14 WRD Canterbury S 53505
St Andrew's - - - 3/7/1876 Reporting length of Timaru – Waitaki line to St Andrews opened for traffic on 1/7/1876. Timaru Section - W 3 PWD Canterbury S 53506
St Andrew's - - - 30/1/1884 Application for a level crossing by St Andrews station by the New Zealand & Australian Land Coy Ltd. Timaru Section - W 1820 WRD Canterbury S 53507
St Andrew's - - - 31/3/1883 Removal of tank stand from St Andrews to Selwyn - £28/19/2. Timaru Section - R4, 83/2044 WRD Canterbury S 53508
St Andrew's - - - 31/3/1883 Shifting hut from Burnham, and adding to stationmaster's house at St Andrews - £8.12.6. Timaru Section - R4, 83/2044 WRD Canterbury S 53509
St Andrew's - - - 31/3/1884 Cattle yards provided. Timaru Section - AJHR, 1884 ATL Canterbury S 53510
St Andrew's - - - 31/3/1885 Private siding granted on 23/8/1880 to the New Zealand & Australian Land Coy (Ltd) (present holder) at 116 miles 19 chains, St Andrews. Timaru Section - R4, 83/2044 WRD Canterbury S 53511
St Andrew's - - - 31/3/1893 Loading bank provided. Timaru Section - AJHR, 1893 ATL Canterbury S 53512
St Andrew's - - - 31/5/1898 A portion of the Main South Road near St Andrews was, many years ago, diverted in order to make a [?] and took over some Railway land. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53513
St Andrew's - - - 31/5/1898 In 1896 the Waimate County Council asked that this piece of diverted road might be vested in them, as they were maintaining it and had a spent a considerable sum forming and building bridges. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53514
St Andrew's - - - 31/5/1898 The County Council have now closed the old road. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53515
St Andrew's - - - 31/5/1898 This was agreed to. Proclamation dated 10/9/1896. Timaru Section - W 2493, 96/1074 WRD Canterbury S 53516
St Andrew's - - - 7/3/1883 Application for level crossing at south end of station yard (about 116 miles 22 chains). Timaru Section - W 1820 WRD Canterbury S 53517
St Andrew's - - - 8/9/1881 Application for ladies waiting room. Timaru Section - W3199, 10/2868 WRD Canterbury S 53518