Main North Line
Jump to navigation
Jump to search
Construction of the Main North Line spanned nearly 100 years with the first portions from Addington to Rangiora in the south built in 1872, and at the northern end from Picton to Blenhein in 1875. The final linking section between Kaikoura and Hundalee was not completed till the end of 1945. Due to its length (348km) the description of the lines construction will be dealt with in 5 sections, roughly aligning with construction phases, but in reverse sequence from Picton to Christchurch (to line up with the maps), rather than chronologically.
ADDINGTON to WAIPARA
Station | Mileage M.ch | Metrage km | Elevation ft | Elevation m | Opened | Closed |
---|---|---|---|---|---|---|
Christchurch(2) | n/a | 0.51 | (12) | 5/04/1993 | n/a | |
Riccarton | 1.18 | 2.03 | 32 | 10 | 29/04/1872 | 2/07/1977 |
Bryndwr | 2.29 | 3.79 | 39 | 12 | ? | 27/03/1977 |
Papanui | 5.32 | 8.67 | 74 | 23 | 26/02/1876 | 3/09/1955 |
Styx | 6.72 | 11.10 | (22) | (6) | 17/06/1915 | 3/09/1955 |
Belfast | 8.32 | 13.52 | 28 | 13 | 31/01/1876 | 3/09/1955 |
Chaneys | 9.32 | 15.13 | 51 | 16 | c.23/04/1895 | 3/09/1955 |
Kainga | 10.32 | 16.74 | 72 | 22 | 31/01/1876 | 3/09/1955 |
Kaiapoi | 13.16 | 21.24 | 93 | 28 | 31/01/1876 | 3/09/1955 |
Eyerton Junction | 14.48 | 23.50 | 123 | 36 | 31/01/1876 | 3/09/1955 |
Flaxton | 17.24 | 27.84 | 204 | 62 | 31/01/1876 | 3/09/1955 |
Southbrook | 20.22 | 32.19 | 328 | 100 | 31/01/1876 | 3/09/1955 |
Rangiora | 21.16 | 34.12 | 367 | 112 | 25/07/1881 | 3/09/1955 |
Ashley | 22.56 | 35.63 | 438 | 134 | 25/07/1881 | 3/09/1955 |
Sefton | 31.72 | 51.34 | 621 | 189 | 16/02/1899 | 3/09/1955 |
Balcairn | 35.08 | 56.49 | 529 | 161 | 22/10/1906 | 13/06/1954 |
Grays Road | 36.64 | 59.22 | 479 | 146 | 6/08/1906 | 3/09/1955 |
Amberley | 39.48 | 63.73 | 555 | 169 | 6/08/1906 | 3/09/1955 |
Greneys Road | 42.24 | 68.08 | 671 | 205 | 6/08/1906 | 3/09/1955 |
Glasnevin | 47.32 | 76.28 | 896 | 274 | 18/12/1908 | 3/09/1955 |
Waipara | 50.48 | 81.43 | 1064 | 325 | 2/09/1912 | 3/09/1955 |