File Records:Kawatiri

From Railway Knowledge Base for New Zealand
Revision as of 06:01, 21 January 2022 by Robert (talk | contribs) (added initial data)
Jump to navigation Jump to search
Glenhope Kawatiri Gowan_Bridge
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Glenhope--Kawatiri Kawatiri--Gowan_Bridge
{{{Prev_Dist}}} {{{Next_Dist}}}

Go to Kawatiri on the Network Diagram



Name Alt 1 Alt 2 Alt 3 Date Details Railway Rly 2 Reference Source Locality Island Sequence
Kawatiri - - - 4/2/1913 Plan of Kawatiri station yard. Nelson Section - W 3 PWD Nelson S 23429
Kawatiri - - - 13/3/1913 Telephone from Glenhope to Kawatiri – requesting authority £135. Nelson Section - W 3 PWD Nelson S 23430
Kawatiri - - - 17/5/1915 With the addition of a loading bank, the accommodation proposed at Kawatiri station yard appears suitable and sufficient. Nelson Section - R3, 28/1870 WRD Nelson S 23431
Kawatiri - - - 5/8/1925 Engine F 146 handed over to the Public Works Department for use on the Glenhope – Kawatiri Section. Nelson Section - W2278, 03/3844 ATL Nelson S 23432
Kawatiri - - - 11/6/1926 Mileage 64 miles 01 chains 46 links. Nelson Section - R3, 28/1870 WRD Nelson S 23433
Kawatiri - - - 16/6/1926 Accommodation shelter shed, passenger platform (right side of line), cart approach to platform, goods shed 20ft x 14ft, loading bank, cattle and sheep yards. Nelson Section - JRS/337 ATL Nelson S 23434
Kawatiri - - - 16/6/1926 Loop 25 wagons, backshunt 9 wagons (cattle yards). Nelson Section - JRS/337 ATL Nelson S 23435
Kawatiri - - - 16/6/1926 Mileage 3 miles 75 chains from Glenhope. Nelson Section - JRS/337 ATL Nelson S 23436
Kawatiri - - - 21/6/1926 Station handed over to Working Railways Department. Nelson Section - JRS/337 ATL Nelson S 23437
Kawatiri - - - 10/4/1930 Sheep traffic is being worked between Kawatiri and Gowan Bridge. Nelson Section - R-W1, 22/146 WRD Nelson S 23438
Kawatiri - - - 6/6/1931 Proposal to close Kawatiri station. Nelson Section - R3, 28/1870 WRD Nelson S 23439
Kawatiri - - - 2/1941 Rails to Kawatiri lifted. Nelson Section - R3, 28/1870 WRD Nelson S 23440
Kawatiri - - - 22/5/1950 The Railway Department controls the line between Nelson and Kawatiri and the Ministry of Works the line beyond Kawatiri to Gowan Bridge. Nelson Section - W2559, 505/4/2 WRD Nelson S 23441
Kawatiri - - - 20/8/1952 Goods shed 30ft x 20ft. Nelson Section - R3, 28/1870 WRD Nelson S 23442
Kawatiri - - - 20/8/1952 The goods shed is built of timber framing and corrugated iron and is in good condition. Nelson Section - R3, 28/1870 WRD Nelson S 23443
Kawatiri - - - 20/8/1952 The goods shed is used by the Public Works Department and farmers store hay in it. Nelson Section - R3, 28/1870 WRD Nelson S 23444
Kawatiri - - - Early 1950's Shelter shed, passenger platform. Nelson Section - JRS/P229 ATL Nelson S 23445