Nelson Section

From Railway Knowledge Base for New Zealand
Revision as of 23:20, 18 January 2022 by Robert (talk | contribs) (Data Table added)
Jump to navigation Jump to search
caption

The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill section, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years. When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.

Station Mileage M.ch Metrage km Elevation ft Elevation m Opened Closed
Port 0.00 0.00 10 3 17/05/1880 3/09/1955
Nelson 1.00 1.60 10 3 31/01/1876 3/09/1955
Bishopdale 2.72 4.67 213 65 31/01/1876 3/09/1955
Stoke 5.32 8.67 74 23 26/02/1876 3/09/1955
Freezing_Works 6.72 11.10 (22) (6) 17/06/1915 3/09/1955
Richmond 8.32 13.52 31/01/1876 3/09/1955
Appleby 9.32 c.23/04/1895 3/09/1955
Hope 10.32 31/01/1876 3/09/1955
Brightwater 13.16 31/01/1876 3/09/1955
Spring_Grove 14.48 31/01/1876 3/09/1955
Wakefield 17.24 31/01/1876 3/09/1955
Wai-iti 20.22 31/01/1876 3/09/1955
Foxhill 21.16 25/07/1881 3/09/1955
Belgrove 22.56 25/07/1881 3/09/1955
Motupiko 31.72 16/02/1899 3/09/1955
Mararewa 35.08 22/10/1906 13/06/1954
Tapawera 36.64 6/08/1906 3/09/1955
Rakau 39.48 6/08/1906 3/09/1955
Tadmor 42.24 6/08/1906 3/09/1955
Kiwi 47.32 18/12/1908 3/09/1929
Tui 50.48 2/09/1912 3/09/1955
Kaka 55.32 2/09/1912 3/09/1955
Glenhope 60.19 24/04/1912 3/09/1955
Kawatiri 64.10 21/06/1926 21/06/1931
Gowan_Bridge 67.03 13/05/1929 24/06/1933