File Records:Mirza

From Railway Knowledge Base for New Zealand
Revision as of 00:28, 18 January 2022 by Robert (talk | contribs) (Initial Data Input)
Jump to navigation Jump to search
Wharanui Mirza Ward
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Wharanui - Mirza Mirza - Ward
{{{Prev_Dist}}} {{{Next_Dist}}}

Go to Mirza on the Network Diagram



Name Alt 1 Alt 2 Alt 3 Date Details Railway Rly 2 Reference Source Locality Island Sequence
Mirza - - - 28/2/1910 Suggests name of Mirza for terminal station. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32533
Mirza - - - 14/6/1910 Accommodation at Mirza station. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32534
Mirza - - - 29/8/1910 Station at Mirza. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32535
Mirza - - - 19/9/1910 Cottage of timekeeper at Mirza station. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32536
Mirza - - - 13/12/1910 Platelayer's cottage final certificate. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32537
Mirza - - - 23/1/1911 Mirza Section – erection of telephones – requesting authority £250. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32538
Mirza - - - 16/2/1911 Two platelayers' cottages – contract let to James McKinley, Blenheim, amount £367.17.6. Waipara – Blenheim Railway South Island Main Trunk Railway W 34/1 PWD Marlborough S 32539
Mirza - - - 28/2/1911 Mirza Section – platelayer's cottage – contract signed. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32540
Mirza - - - 16/5/1911 Above contract completed. Waipara – Blenheim Railway South Island Main Trunk Railway W 34/1 PWD Marlborough S 32541
Mirza - - - 22/5/1911 James McKinley's contract for one platelayer's cottage completed. Waipara – Blenheim Railway South Island Main Trunk Railway W 12 PWD Marlborough S 32542
Mirza - - - 2/6/1911 Mirza Section – platelayer's cottage – contract – final certificate. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32543
Mirza - - - 14/2/1912 Telephone line from Mirza to Mills – requesting 60 additional telephone poles. Waipara – Blenheim Railway South Island Main Trunk Railway W 3 PWD Marlborough S 32544
Mirza - - - 4/12/1915 Accommodation shelter shed and ladies waiting room, platform 200ft, goods shed 30ft x 20ft (with veranda), loading bank, stockyards, latrines. Waipara – Blenheim Railway South Island Main Trunk Railway W 3337 WRD Marlborough S 32545
Mirza - - - 4/12/1915 Flag station opened, 51 miles 40 chains from Picton. Waipara – Blenheim Railway South Island Main Trunk Railway W 3337 WRD Marlborough S 32546
Mirza - - - 4/12/1915 Loop 38 wagons (crossing), loop 18 wagons (goods shed), backshunt 13 wagons (stockyards). Waipara – Blenheim Railway South Island Main Trunk Railway W 3337 WRD Marlborough S 32547
Mirza - - - 2/8/1926 Mileage 51 miles 40 chains from Picton. Waipara – Blenheim Railway South Island Main Trunk Railway W 3337 WRD Marlborough S 32548
Mirza - - - 27/9/1940 The first loop has now been lifted. 40 wagons. Waipara – Blenheim Railway South Island Main Trunk Railway W2559, 505/4/2 WRD Marlborough S 32549
Mirza - - - 27/9/1940 Still in place are the goods shed loop (23 wagons) and backshunt (15 wagons). Waipara – Blenheim Railway South Island Main Trunk Railway W2559, 505/4/2 WRD Marlborough S 32550
Mirza - - - 2/10/1960 Mileage 46 miles 46 chains from Kaikoura. Waipara – Blenheim Railway South Island Main Trunk Railway W 3337 WRD Marlborough S 32551
Mirza - - - 24/4/1966 Closed to all traffic. Waipara – Blenheim Railway South Island Main Trunk Railway W3180, Pub 3 WRD Marlborough S 32552