Nelson Section: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
! Elevation ft | ! Elevation ft | ||
! Elevation m | ! Elevation m | ||
! Opened | |||
! Closed | |||
|- | |- | ||
|style="text-align: left;"|[[Port]] | |style="text-align: left;"|[[Port]] | ||
Line 38: | Line 40: | ||
|11.10 | |11.10 | ||
|22 | |22 | ||
| | |6 | ||
|- | |- | ||
|style="text-align: left;"|[[Richmond]] | |style="text-align: left;"|[[Richmond]] |
Revision as of 20:42, 18 January 2022
The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill section, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years. When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.
Station | Mileage M.ch | Metrage km | Elevation ft | Elevation m | Opened | Closed |
---|---|---|---|---|---|---|
Port | 0.00 | 0.00 | 10 | 3 | ||
Nelson | 1.00 | 1.60 | 10 | 3 | ||
Bishopdale | 2.72 | 4.67 | 213 | 65 | ||
Stoke | 5.32 | 8.67 | 74 | 23 | ||
Freezing_Works | 6.72 | 11.10 | 22 | 6 | ||
Richmond | 8.32 | 13.52 | ||||
Appleby | ||||||
Hope | ||||||
Brightwater |