Nelson Section: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
No edit summary
No edit summary
Line 33: Line 33:
|74  
|74  
|23
|23
|-
|[[Freezing_Works]]
|[[Freezing_Works]]
|6.72
|6.72
Line 38: Line 39:
|22
|22
|7
|7
|-
|[[Richmond]]
|[[Richmond]]
|8.32
|8.32
Line 43: Line 45:
|
|
|
|
|-
|[[Appleby]]
|[[Appleby]]
|
|
Line 48: Line 51:
|
|
|
|
|-
|[[Hope]]
|[[Hope]]
|
|
Line 53: Line 57:
|
|
|
|
|-
|[[Brightwater]]
|[[Brightwater]]
|}
|}

Revision as of 20:23, 18 January 2022

caption

The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill section, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years. When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.

Station Mileage M.ch Metrage km Elevation ft Elevation m
Port 0.00 0.00 10 3
Nelson 1.00 1.60 10 3
Bishopdale 2.72 4.67 213 65
Stoke 5.32 8.67 74 23
Freezing_Works 6.72 11.10 22 7
Richmond 8.32 13.52
Appleby
Hope
Brightwater