Nelson Section: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
{| class="wikitable" style="width:300px;" | {| class="wikitable" style="width:300px;" | ||
! style="text-align:left;"|Station | ! style="text-align: left;"|Station | ||
! style="text-align:center;"|Mileage M.ch | ! style="text-align: center;"|Mileage M.ch | ||
! Metrage km | ! Metrage km | ||
! Elevation ft | ! Elevation ft |
Revision as of 20:27, 18 January 2022
The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill section, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years. When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.
Station | Mileage M.ch | Metrage km | Elevation ft | Elevation m |
---|---|---|---|---|
Port | 0.00 | 0.00 | 10 | 3 |
Nelson | 1.00 | 1.60 | 10 | 3 |
Bishopdale | 2.72 | 4.67 | 213 | 65 |
Stoke | 5.32 | 8.67 | 74 | 23 |
Freezing_Works | 6.72 | 11.10 | 22 | 7 |
Richmond | 8.32 | 13.52 | ||
Appleby | ||||
Hope | ||||
Brightwater |