File Records:Elevation: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
(Created page with "{{Trail_Station|Prev_Station=Mount Pleasant|Next_Station=Picton|Prev_Section=Mount Pleasant - Elevation|Next_Section=Elevation - Picton}} South_Island_Networ...")
 
(Initial Data Input)
Line 1: Line 1:
{{Trail_Station|Prev_Station=[[Mount Pleasant]]|Next_Station=[[Picton]]|Prev_Section=[[Mount Pleasant - Elevation]]|Next_Section=[[Elevation - Picton]]}}
{{Trail_Station|Prev_Station=[[Mount Pleasant]]|Next_Station=[[Picton]]|Prev_Section=[[Mount Pleasant - Elevation]]|Next_Section=[[Elevation - Picton]]}}
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
{| class="wikitable"
|Name
|Alt 1
|Alt 2
|Alt 3
|
|Details
|Railway
|Rly 2
|Reference
|Source
|Locality
|Island
|Sequence
|-
|Elevation
| -
| -
| -
|21/2/1910
|Water supply at Elevation.
|Blenheim – Waipara Railway
|Picton Section
|W 3
|PWD
|Marlborough
|S
|11497
|-
|Elevation
| -
| -
| -
|17/5/1911
|Improvements to grades.
|Blenheim – Waipara Railway
|Picton Section
|W3734/28
|WRD
|Marlborough
|S
|11498
|-
|Elevation
| -
| -
| -
|3/1950
|Backshunt and loading bank  removed.
|Blenheim – Waipara Railway
|Picton Section
|W2382, 039
|WRD
|Marlborough
|S
|11499
|-
|Elevation
| -
| -
| -
|2/10/1960
|Mileage 95 miles 74 chains from  Kaikoura.
|Blenheim – Waipara Railway
|Picton Section
|W 3337
|WRD
|Marlborough
|S
|11500
|-
|Elevation
| -
| -
| -
|25/9/1968
|Station will be closed to all  traffic from Monday 14/10/1962.
|Blenheim – Waipara Railway
|Picton Section
|R4, 97/3510
|WRD
|Marlborough
|S
|11501
|-
|Elevation
| -
| -
| -
|1/2/1897
|Mileage 2 miles 9 chains from  Picton.
|Blenheim – Waipara Railway
|Picton Section
|W 3337
|WRD
|Marlborough
|S
|11502
|-
|Elevation
| -
| -
| -
|20/11/1872
|Progress of construction is to  be seen from the top of the Elevation to near the Opawa River.
|Picton – Blenheim Railway
| -
|A&NZG
|ATL
|Marlborough
|S
|11503
|}

Revision as of 08:18, 17 January 2022

Mount Pleasant Elevation Picton
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Mount Pleasant - Elevation Elevation - Picton
{{{Prev_Dist}}} {{{Next_Dist}}}

Go to Elevation on the Network Diagram



Name Alt 1 Alt 2 Alt 3 Details Railway Rly 2 Reference Source Locality Island Sequence
Elevation - - - 21/2/1910 Water supply at Elevation. Blenheim – Waipara Railway Picton Section W 3 PWD Marlborough S 11497
Elevation - - - 17/5/1911 Improvements to grades. Blenheim – Waipara Railway Picton Section W3734/28 WRD Marlborough S 11498
Elevation - - - 3/1950 Backshunt and loading bank removed. Blenheim – Waipara Railway Picton Section W2382, 039 WRD Marlborough S 11499
Elevation - - - 2/10/1960 Mileage 95 miles 74 chains from Kaikoura. Blenheim – Waipara Railway Picton Section W 3337 WRD Marlborough S 11500
Elevation - - - 25/9/1968 Station will be closed to all traffic from Monday 14/10/1962. Blenheim – Waipara Railway Picton Section R4, 97/3510 WRD Marlborough S 11501
Elevation - - - 1/2/1897 Mileage 2 miles 9 chains from Picton. Blenheim – Waipara Railway Picton Section W 3337 WRD Marlborough S 11502
Elevation - - - 20/11/1872 Progress of construction is to be seen from the top of the Elevation to near the Opawa River. Picton – Blenheim Railway - A&NZG ATL Marlborough S 11503