YARN4: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 9: Line 9:
'''CONTENTS'''
'''CONTENTS'''


'''NZ's First Railfan Special excursion''' - Auckland - Onehunga - Waiuku - Auckland
'''NZ's First Railfan Special excursion''' - Auckland - Onehunga - Waiuku - Auckland planned for 27/02/1954


'''Station Developments'''
'''Station Developments'''
Line 19: Line 19:
'''Auckland port''''s Import Wharf has the most modern track arrangement in NZ. Loco_C862 was testing the track on 18/09/1953
'''Auckland port''''s Import Wharf has the most modern track arrangement in NZ. Loco_C862 was testing the track on 18/09/1953


'''Timetable changes''' for the main Trunk which also incorporate the permanent 30 mph restriction for 11 miles over the Mercer Swamps .
'''Timetable changes''' for the main Trunk which also incorporate the permanent 30 mph restriction for 11 miles over the Mercer Swamps.
 
'''Rail Projects'''
*Extension of Auckland's Inward Goods Depot is nearly complete
*The large new Goods Depot Offices at Frankton are nearly complete.
*The Murupara Branch rail-head had reached the mill Site ahead of schedule
*Pukekohe, Interlocking is installed other activities under way
*Mt Maunganui Branch, rails have been laid out on new formation with sleeper laying to start from the junction end.
*Two 'Ranfurly Shield' specials to (Waikato?), the 1st of 10 cars pulled by loco_Ja1284 left at 5:20pm with the 2nd of 11 cars pulled by loco_Ja1282 leaving at 6:05pm with both trains returning around 10:00am the next morning. (data corrected as per YARN5)
 
'''Auckland Depot News'''
*Loco_Bb625 returned from Hutt Workshops on 16/09/1953
*Loco_Ab821 went to Hutt? Workshops on 24/09/1953
*Loco_Ww556 went to Whangarei on 18/08/1953 with Loco_Ww678 returning the same day
*Loco_Ww676 (ref YARN5) and *Loco_C851 have both completed light overhauls at Auckland Fitting Shop
*Loco_Wab769 and another suffered cracked cylinders on 22/09/1953
*Loco_Wab768 had a tube failure at Papakura on 22/09/1953.
*Loco_Jb1206 and Loco_C854 have been sent to Rotten Row outside Hutt Shops
*Loco_J1238  and *Loco_Ab703 have returned from their loan to Taumarunui on 24/09/1953
*Loco_Jb1205 broke an axle at Waimauku towing the Express. Trail_122RR following it was not affected
*Loco_Wab765 and Loco_ Wab796 (on 9/09/1953) were involved in two suspicious derailments at St Georges Road and it is understood the police have made arrests.
*Loco_J1209, towing a crippled Loco_Jb1200 some stock and a van, cracked a cylinder at Wharepapa on 9/09/1953 and had to continue into Auckland on one cylinder, with a forced stop at Morningside due to loco_Wab796's incident.
*Loco_Ja1278 on train_121 was on time pulling a 5 total train on 26/09/1953.
*A derailed wagon on 20/09/1953 was dragged 2 miles along the sleepers on the Up main to Drury delaying early morning goods trains
 
'''Frankton'''
*Loco_K908 (oil burning) has returned from Hutt.
*Loco_Wa165 has left for Hutt Workshops
*Loco_A581? has left for the South Island with the other A_class_loco's following as they wear out.
*Loco_Ja1282 climbed the 3.5mile 1 in 100 Whangarata bank at 50mph representing 900 DHP
*The Cambridge Branch is nearly always worked by A_class_loco's now
 
'''Westfield Freezing Co''''s year old 0-6-0 was under overhaul early in September 1953 and the elderly 0-4-0 was set to work again

Latest revision as of 02:28, 16 May 2023

Prev Issue Next Issue

Full Name: Your Auckland Railway News

Issue Number: 4

Issue Date:

Volume and Number: 1/4

Pages: 2

Page Range: 1-2

Cover Image: n.a.


CONTENTS

NZ's First Railfan Special excursion - Auckland - Onehunga - Waiuku - Auckland planned for 27/02/1954

Station Developments

  • Auckland Station is being repainted and renovated
  • Baldwin Ave and Fruitvale Rd stations came into use from the 28/09/1953
  • Strand Station (Tauranga) has been renewed to a design similar to the Hutt Valley Stations
  • Taumarunui signalling has been upgraded to colour lights and motorised points

Auckland port's Import Wharf has the most modern track arrangement in NZ. Loco_C862 was testing the track on 18/09/1953

Timetable changes for the main Trunk which also incorporate the permanent 30 mph restriction for 11 miles over the Mercer Swamps.

Rail Projects

  • Extension of Auckland's Inward Goods Depot is nearly complete
  • The large new Goods Depot Offices at Frankton are nearly complete.
  • The Murupara Branch rail-head had reached the mill Site ahead of schedule
  • Pukekohe, Interlocking is installed other activities under way
  • Mt Maunganui Branch, rails have been laid out on new formation with sleeper laying to start from the junction end.
  • Two 'Ranfurly Shield' specials to (Waikato?), the 1st of 10 cars pulled by loco_Ja1284 left at 5:20pm with the 2nd of 11 cars pulled by loco_Ja1282 leaving at 6:05pm with both trains returning around 10:00am the next morning. (data corrected as per YARN5)

Auckland Depot News

  • Loco_Bb625 returned from Hutt Workshops on 16/09/1953
  • Loco_Ab821 went to Hutt? Workshops on 24/09/1953
  • Loco_Ww556 went to Whangarei on 18/08/1953 with Loco_Ww678 returning the same day
  • Loco_Ww676 (ref YARN5) and *Loco_C851 have both completed light overhauls at Auckland Fitting Shop
  • Loco_Wab769 and another suffered cracked cylinders on 22/09/1953
  • Loco_Wab768 had a tube failure at Papakura on 22/09/1953.
  • Loco_Jb1206 and Loco_C854 have been sent to Rotten Row outside Hutt Shops
  • Loco_J1238 and *Loco_Ab703 have returned from their loan to Taumarunui on 24/09/1953
  • Loco_Jb1205 broke an axle at Waimauku towing the Express. Trail_122RR following it was not affected
  • Loco_Wab765 and Loco_ Wab796 (on 9/09/1953) were involved in two suspicious derailments at St Georges Road and it is understood the police have made arrests.
  • Loco_J1209, towing a crippled Loco_Jb1200 some stock and a van, cracked a cylinder at Wharepapa on 9/09/1953 and had to continue into Auckland on one cylinder, with a forced stop at Morningside due to loco_Wab796's incident.
  • Loco_Ja1278 on train_121 was on time pulling a 5 total train on 26/09/1953.
  • A derailed wagon on 20/09/1953 was dragged 2 miles along the sleepers on the Up main to Drury delaying early morning goods trains

Frankton

  • Loco_K908 (oil burning) has returned from Hutt.
  • Loco_Wa165 has left for Hutt Workshops
  • Loco_A581? has left for the South Island with the other A_class_loco's following as they wear out.
  • Loco_Ja1282 climbed the 3.5mile 1 in 100 Whangarata bank at 50mph representing 900 DHP
  • The Cambridge Branch is nearly always worked by A_class_loco's now

Westfield Freezing Co's year old 0-6-0 was under overhaul early in September 1953 and the elderly 0-4-0 was set to work again