File Records:Kawatiri: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
(added initial data)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Trail_Station|Prev_Station=[[Glenhope]]|Next_Station=[[Gowan_Bridge]]|Prev_Section=[[Glenhope--Kawatiri]]|Next_Section=[[Kawatiri--Gowan_Bridge]]}}
{{Trail_StationC|Prev_Station=[[Glenhope]]|Next_Station=[[Gowan_Bridge]]|Prev_Section=[[Glenhope--Kawatiri]]|Next_Section=[[Kawatiri--Gowan_Bridge]]|Prev_Dist=6.6km|Next_Dist=6.3km}}
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]



Latest revision as of 08:24, 24 February 2022

Glenhope Kawatiri Gowan_Bridge
Trail StnSLC.png Trail SectRC.png Trail StnLC.png Trail SectRC.png Trail StnSRC.png
Glenhope--Kawatiri Kawatiri--Gowan_Bridge
6.6km 6.3km

Go to Kawatiri on the Network Diagram



Name Alt 1 Alt 2 Alt 3 Date Details Railway Rly 2 Reference Source Locality Island Sequence
Kawatiri - - - 4/2/1913 Plan of Kawatiri station yard. Nelson Section - W 3 PWD Nelson S 23429
Kawatiri - - - 13/3/1913 Telephone from Glenhope to Kawatiri – requesting authority £135. Nelson Section - W 3 PWD Nelson S 23430
Kawatiri - - - 17/5/1915 With the addition of a loading bank, the accommodation proposed at Kawatiri station yard appears suitable and sufficient. Nelson Section - R3, 28/1870 WRD Nelson S 23431
Kawatiri - - - 5/8/1925 Engine F 146 handed over to the Public Works Department for use on the Glenhope – Kawatiri Section. Nelson Section - W2278, 03/3844 ATL Nelson S 23432
Kawatiri - - - 11/6/1926 Mileage 64 miles 01 chains 46 links. Nelson Section - R3, 28/1870 WRD Nelson S 23433
Kawatiri - - - 16/6/1926 Accommodation shelter shed, passenger platform (right side of line), cart approach to platform, goods shed 20ft x 14ft, loading bank, cattle and sheep yards. Nelson Section - JRS/337 ATL Nelson S 23434
Kawatiri - - - 16/6/1926 Loop 25 wagons, backshunt 9 wagons (cattle yards). Nelson Section - JRS/337 ATL Nelson S 23435
Kawatiri - - - 16/6/1926 Mileage 3 miles 75 chains from Glenhope. Nelson Section - JRS/337 ATL Nelson S 23436
Kawatiri - - - 21/6/1926 Station handed over to Working Railways Department. Nelson Section - JRS/337 ATL Nelson S 23437
Kawatiri - - - 10/4/1930 Sheep traffic is being worked between Kawatiri and Gowan Bridge. Nelson Section - R-W1, 22/146 WRD Nelson S 23438
Kawatiri - - - 6/6/1931 Proposal to close Kawatiri station. Nelson Section - R3, 28/1870 WRD Nelson S 23439
Kawatiri - - - 2/1941 Rails to Kawatiri lifted. Nelson Section - R3, 28/1870 WRD Nelson S 23440
Kawatiri - - - 22/5/1950 The Railway Department controls the line between Nelson and Kawatiri and the Ministry of Works the line beyond Kawatiri to Gowan Bridge. Nelson Section - W2559, 505/4/2 WRD Nelson S 23441
Kawatiri - - - 20/8/1952 Goods shed 30ft x 20ft. Nelson Section - R3, 28/1870 WRD Nelson S 23442
Kawatiri - - - 20/8/1952 The goods shed is built of timber framing and corrugated iron and is in good condition. Nelson Section - R3, 28/1870 WRD Nelson S 23443
Kawatiri - - - 20/8/1952 The goods shed is used by the Public Works Department and farmers store hay in it. Nelson Section - R3, 28/1870 WRD Nelson S 23444
Kawatiri - - - Early 1950's Shelter shed, passenger platform. Nelson Section - JRS/P229 ATL Nelson S 23445