The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill Railway as the first easy section was promoted as, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years.  When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.
The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill Railway as the first easy section was promoted as, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years.  When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.


The following table lists all the stations with their distances from the start (Port) in both Miles and chains, and in kilometres, It also lists the station's elevation in feet and metres, plus opening an closing dates. Each Station name forms a link to a separate page giving more details about that Station.
The following table lists all the stations with their distances from the start (Port) in both Miles and chains, and in kilometres, It also lists the station's elevation in feet and metres, plus opening an closing dates. The station names form hyperlinks to the individual station pages where more details may be found.


{| class="wikitable" style="text-align: center; width:220px;"
{| class="wikitable" style="text-align: center; width:220px;"
! Station
! Station
! Mileage M.ch
! Mileage M.Ch
! Metrage km
! Metrage km
! Elevation ft
! Elevation ft
Line 38: Line 38:
|3/09/1955
|3/09/1955
|-
|-
| style="text-align: left;" |[[Stoke]]  
| style="text-align: left;" |[[Stoke(N)|Stoke]]  
|5.32  
|5.32  
|8.67  
|8.67  
Line 54: Line 54:
|3/09/1955
|3/09/1955
|-
|-
| style="text-align: left;" |[[Richmond]]
| style="text-align: left;" |[[Richmond(N)|Richmond]]
|8.32
|8.32
|13.52
|13.52
Line 62: Line 62:
|3/09/1955
|3/09/1955
|-
|-
| style="text-align: left;" |[[Appleby]]
| style="text-align: left;" |[[Appleby(N)|Appleby]]
|9.32
|9.32
|15.13
|15.13
Line 216: Line 216:


== CONSTRUCTION ==
== CONSTRUCTION ==
Like any Railway, getting construction underway was never easy and inevitably carried out in stages as funding could be made available. With very low populations in any given area, funding such projects was beyond their means and often involved employing creative alternative. Petitioning to Government played a significant role in which some areas got funding ahead of others, but at the end of the day, the total that could be committed in any one year was spread out in a way that suited Central Government, rather than the wishes of any particular locals.
Like any Railway, getting construction underway in the 1800's was never easy and inevitably carried out in stages as funding could be made available. With very low populations in any given area, funding such projects was beyond their means and often involved employing creative alternative. Petitioning to Government played a significant role in which some areas got funding ahead of others, but at the end of the day, the total that could be committed in any one year was spread out in a way that suited Central Government, rather than the wishes of any particular locals.


==== Preliminaries ====
==== Preliminaries ====
Nelsons railway dreams started in 1862 already, when a feasibility study was requested from the Provincial Council for 19km of railway From Nelson to the Wairoa River. Before long, news of gold discoveries on the West Coast and coal deposits in the mountains to the south-west saw that dream expand to a railway to the Western Ranges. However, the huge burden of debt that the community would be lumbered with shattered those dreams for a number of years until a real gold-rush developed, moving rapidly up the west Coast.  
Nelsons railway dreams started in 1862 already, when a feasibility study was requested from the Provincial Council for 19km of railway From Nelson to the Wairoa River. Before long, news of gold discoveries on the West Coast and coal deposits in the mountains to the south-west saw that dream expand to a railway to the Western Ranges. However, the huge burden of debt that the community would be lumbered with shattered those dreams for a number of years until a real gold-rush developed, moving rapidly up the west Coast.  


The dreams were now now formulated into a defined plan with a land grant proposed to partly fund the construction of a line from Nelson to Cobden (Greymouth). This plan was duly approved by Central Government with the passing of the Nelson, Cobden and Westport Railway Land Act. Nelson however, could still not fund such a grand project and sought support from England which they did eventually find, only to have first the Franco-Prussian war interfere, and then Julius Vogel's Immigration and Public Works Policy, as Central Governments answer to a flagging local economy. The Nelson Provincial Council could not compete against that, so all local efforts came to nothing.
The dreams were now formulated into a defined plan with a land grant proposed to partly fund the construction of a line from Nelson to Cobden (Greymouth). This plan was duly approved by the Central Government with the passing of the Nelson, Cobden and Westport Railway Land Act. Nelson however, could still not fund such a grand project and sought support from England which they did eventually find, only to have first, the Franco-Prussian war interfere, and then Julius Vogel's Immigration and Public Works Policy, as Central Governments answer to a flagging local economy. The Nelson Provincial Council could not compete against that, so all local efforts came to nothing.


From this on point though, the Nelson Cobden Railway was  being promoted by the Government but in a more piecemeal fashion, given the whole scheme was beyond anyone's means. The Provincial Council was still keen to improve the lot of their constituents and approved the construction of 11km of railway from Cobden to Brunner, and 35km of line from Nelson to Foxhill. Meanwhile, and ardent group were still making efforts to look at alternative ways of funding the total scheme, but after months of effort, these all eventually failed. The only consolation was that Julius Vogel (now Premier) agreed to make the proposed route part of the South Island Trunk Line and get surveys and construction underway as soon as practical.
From this point on though, the Nelson Cobden Railway continued to be promoted by the Government but in a more piecemeal fashion, given the whole scheme was beyond anyone's means. The Provincial Council was still keen to improve the lot of their constituents and approved the construction of 11km of railway from Cobden to Brunner, and 35km of line from Nelson to Foxhill. Meanwhile, an ardent group were still making efforts to look at alternative ways of funding the total scheme, but after months of effort, these all eventually failed. The only consolation was that Julius Vogel (now Premier) agreed to make the proposed route part of the South Island Trunk Line and get surveys and construction underway as soon as practical.


==== Nelson - Foxhill ====
==== Nelson - Foxhill ====

Latest revision as of 06:07, 24 February 2022

caption

The Nelson Section as its name implies, remained an isolated section its whole life. With construction starting in April 1873 on the Nelson Foxhill Railway as the first easy section was promoted as, it envisaged a great future with the prospect of linking up with Greymouth and Christchurch via a promised Midland Railway. Construction progress was slow with ultimately 64 miles (just over 100km) constructed over some 50 years. When all construction ceased in 1930, a gap of only a 42 mile (67km) existed in order to connect with Inangahua, the railhead from Christchurch at the time.

The following table lists all the stations with their distances from the start (Port) in both Miles and chains, and in kilometres, It also lists the station's elevation in feet and metres, plus opening an closing dates. The station names form hyperlinks to the individual station pages where more details may be found.

Station Mileage M.Ch Metrage km Elevation ft Elevation m Opened Closed
Port 0.00 0.00 10 3 17/05/1880 3/09/1955
Nelson 1.00 1.60 10 3 31/01/1876 3/09/1955
Bishopdale 2.72 4.67 213 65 31/01/1876 3/09/1955
Stoke 5.32 8.67 74 23 26/02/1876 3/09/1955
Freezing_Works 6.72 11.10 (22) (6) 17/06/1915 3/09/1955
Richmond 8.32 13.52 28 13 31/01/1876 3/09/1955
Appleby 9.32 15.13 51 16 c.23/04/1895 3/09/1955
Hope 10.32 16.74 72 22 31/01/1876 3/09/1955
Brightwater 13.16 21.24 93 28 31/01/1876 3/09/1955
Spring_Grove 14.48 23.50 123 36 31/01/1876 3/09/1955
Wakefield 17.24 27.84 204 62 31/01/1876 3/09/1955
Wai-iti 20.22 32.19 328 100 31/01/1876 3/09/1955
Foxhill 21.16 34.12 367 112 25/07/1881 3/09/1955
Belgrove 22.56 35.63 438 134 25/07/1881 3/09/1955
Motupiko 31.72 51.34 621 189 16/02/1899 3/09/1955
Mararewa 35.08 56.49 529 161 22/10/1906 13/06/1954
Tapawera 36.64 59.22 479 146 6/08/1906 3/09/1955
Rakau 39.48 63.73 555 169 6/08/1906 3/09/1955
Tadmor 42.24 68.08 671 205 6/08/1906 3/09/1955
Kiwi 47.32 76.28 896 274 18/12/1908 3/09/1955
Tui 50.48 81.43 1064 325 2/09/1912 3/09/1955
Kaka 55.32 85.94 1208 369 2/09/1912 3/09/1955
Glenhope 60.19 96.64 1272 388 24/04/1912 3/09/1955
Kawatiri 64.10 103.20 1160 354 21/06/1926 21/06/1931
Gowan_Bridge 67.03 109.5 1050 320 13/05/1929 24/06/1933

CONSTRUCTION

Like any Railway, getting construction underway in the 1800's was never easy and inevitably carried out in stages as funding could be made available. With very low populations in any given area, funding such projects was beyond their means and often involved employing creative alternative. Petitioning to Government played a significant role in which some areas got funding ahead of others, but at the end of the day, the total that could be committed in any one year was spread out in a way that suited Central Government, rather than the wishes of any particular locals.

Preliminaries

Nelsons railway dreams started in 1862 already, when a feasibility study was requested from the Provincial Council for 19km of railway From Nelson to the Wairoa River. Before long, news of gold discoveries on the West Coast and coal deposits in the mountains to the south-west saw that dream expand to a railway to the Western Ranges. However, the huge burden of debt that the community would be lumbered with shattered those dreams for a number of years until a real gold-rush developed, moving rapidly up the west Coast.

The dreams were now formulated into a defined plan with a land grant proposed to partly fund the construction of a line from Nelson to Cobden (Greymouth). This plan was duly approved by the Central Government with the passing of the Nelson, Cobden and Westport Railway Land Act. Nelson however, could still not fund such a grand project and sought support from England which they did eventually find, only to have first, the Franco-Prussian war interfere, and then Julius Vogel's Immigration and Public Works Policy, as Central Governments answer to a flagging local economy. The Nelson Provincial Council could not compete against that, so all local efforts came to nothing.

From this point on though, the Nelson Cobden Railway continued to be promoted by the Government but in a more piecemeal fashion, given the whole scheme was beyond anyone's means. The Provincial Council was still keen to improve the lot of their constituents and approved the construction of 11km of railway from Cobden to Brunner, and 35km of line from Nelson to Foxhill. Meanwhile, an ardent group were still making efforts to look at alternative ways of funding the total scheme, but after months of effort, these all eventually failed. The only consolation was that Julius Vogel (now Premier) agreed to make the proposed route part of the South Island Trunk Line and get surveys and construction underway as soon as practical.

Nelson - Foxhill

Legislation authorising the construction of the Nelson and Foxhill Railway had become law in November 1871, with survey work completed and design drawings well advanced by August 1872 for a low-level Line following the coastal cliffs between the port and Stoke. However when John Carruthers (then Engineer-in-Chief) visited in late November, he instructed further survey work for an alignment over Jenkins Hill deeming that the better line in the long term. While this delayed that section of the railway, orders were issued to call tenders as soon as possible for the Stoke to Foxhill section with land acquisition to also get underway. An order was placed in February 1873 for the track, Locomotives and carriages to be supplied from England. March saw the Waimea Contract (Stoke to Foxhill) let to Scott & Robinson from Nelson for ???? with the turning of the first sod celebrated on Tuesday May 6th 1873. It was November before a final decision was made to adopt the Jenkins Hill route and March 16th 1874 before a contract was let to Bray Bros for the sum of £11,125 19s 8d. for the earthworks. The first sod was turned just 9 days later.

The only substantial bridge on this section crossed the Wairoa River at Brightwater

Two engines and six carriages were supplied as part of the initial railway equipment with the first locomotive fired on May 3rd 1875 These two engines were later to be classified D and were of a 2-4-0 wheel arrangement and designed and built by Neilson & Co of Glasgow. They were from the first batch of these locomotive (7 in total), and received the names Trout and Kingfisher.

It wasn't until motive power was available that good progress could be made with the track. John Scott had won the tender for track laying and used the engines for carting track materials and ballast, with the official opening ceremony taking place on January 29th 1876.

While this railway was touted as the Nelson Foxhill Railway, the first two contracts in fact only went as far as what was technically Upper Wakefield, later to be called Wai-iti a mile short of Foxhill.