File Records:Matarae Siding: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
(Created page with "{{Trail_Station|Prev_Station=Matarae|Next_Station=Sutton|Prev_Section=Matarae--Matarae_Siding|Next_Section=Matarae_Siding--Sutton|Prev_Dist=2.5km|Next_Dist=2.9...")
 
(i)
 
Line 1: Line 1:
{{Trail_Station|Prev_Station=[[Matarae]]|Next_Station=[[Sutton]]|Prev_Section=[[Matarae--Matarae_Siding]]|Next_Section=[[Matarae_Siding--Sutton]]|Prev_Dist=2.5km|Next_Dist=2.9km}}
{{Trail_Station|Prev_Station=[[Matarae]]|Next_Station=[[Sutton]]|Prev_Section=[[Matarae--Matarae_Siding]]|Next_Section=[[Matarae_Siding--Sutton]]|Prev_Dist=2.5km|Next_Dist=2.9km}}
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
{| class="wikitable"
|Name
|Alternative Name 1
|Alternative Name 2
|Alternative Name 3
|Date
|Details
|Railway
|Railway 2
|Reference
|Source
|Locality
|Island
|Sequence
|-
|Matarae Camp
|Matarae Siding
| -
| -
|11/3/1914
|A temporary loop siding is  required in connection with the military camp. Siding to be at 33 miles 54  chains and will accommodate 50 wagons.
|Otago Central Railway
| -
|W3199, 4377/1
|WRD
|Otago
|S
|30730
|-
|Matarae Camp
|Matarae Siding
| -
| -
|30/1/1930
|Authority for £350 to provide  crossing loop, etc.
|Otago Central Railway
| -
|W4103, 16/2450/10
|WRD
|Otago
|S
|30731
|-
|Matarae Siding
|Matarae Camp
| -
| -
|10/2/1930
|Approval to make station a  switch out tablet station.
|Otago Central Railway
| -
|W4103, 16/2450/10
|WRD
|Otago
|S
|30732
|-
|Matarae Siding
|Matarae Camp
| -
| -
|27/6/1930
|Closed as a tablet station.
|Otago Central Railway
| -
|W4103, 16/2450/10
|WRD
|Otago
|S
|30733
|}

Latest revision as of 02:16, 6 February 2022

Matarae Matarae Siding Sutton
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Matarae--Matarae_Siding Matarae_Siding--Sutton
2.5km 2.9km

Go to Matarae Siding on the Network Diagram



Name Alternative Name 1 Alternative Name 2 Alternative Name 3 Date Details Railway Railway 2 Reference Source Locality Island Sequence
Matarae Camp Matarae Siding - - 11/3/1914 A temporary loop siding is required in connection with the military camp. Siding to be at 33 miles 54 chains and will accommodate 50 wagons. Otago Central Railway - W3199, 4377/1 WRD Otago S 30730
Matarae Camp Matarae Siding - - 30/1/1930 Authority for £350 to provide crossing loop, etc. Otago Central Railway - W4103, 16/2450/10 WRD Otago S 30731
Matarae Siding Matarae Camp - - 10/2/1930 Approval to make station a switch out tablet station. Otago Central Railway - W4103, 16/2450/10 WRD Otago S 30732
Matarae Siding Matarae Camp - - 27/6/1930 Closed as a tablet station. Otago Central Railway - W4103, 16/2450/10 WRD Otago S 30733