File Records:Hundalee: Difference between revisions

From Railway Knowledge Base for New Zealand
Jump to navigation Jump to search
(Created page with "{{Trail_Station|Prev_Station=Parnassus|Next_Station=Claverley|Prev_Section=Parnassus - Hundalee|Next_Section=Hundalee - Claverley}} South_Island_Network_Diag...")
 
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Trail_Station|Prev_Station=[[Parnassus]]|Next_Station=[[Claverley]]|Prev_Section=[[Parnassus - Hundalee]]|Next_Section=[[Hundalee - Claverley]]}}
{{Trail_Station|Prev_Station=[[Ferniehurst]]|Next_Station=[[Claverley]]|Prev_Section=[[Ferniehurst--Hundalee]]|Next_Section=[[Hundalee--Claverley]]|Prev_Dist=8.8km|Next_Dist=5.7km}}
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to  {{PAGENAME}} on the Network Diagram]]
{| class="wikitable"
|Hundalee
| -
| -
| -
|1/4/1936
|Buildings, etc., required at  Hundalee: approach road, 2 No points and crossings (1 in 9), shelter shed and  ladies waiting room (PWD 56529), platform, 200ft (PWD 24118, concrete),  latrines (2 stall), goods shed (30ft x 20ft with verandah), loading bank (PWD  24118, concrete, 27ft x 15ft), sheep and cattle yards (PWD 24816, double  yards), water supply, 2 No stop blocks, platform fences, 2 No platelayers'  cottages.
|Waipara – Blenheim Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|19618
|-
|Hundalee
| -
| -
| -
|11/10/1937
|Hundalee station arrangement  approved.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19619
|-
|Hundalee
| -
| -
| -
|27/9/1938
|Buildings required at Hundalee:  station building (62ft x 13ft, PWD Drawing 8851, with stationmaster's office  extended 8ft), goods shed (35ft x 20ft), three staff cottages.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19620
|-
|Hundalee
| -
| -
| -
|10/1939
|Ferniehurst, Hundalee, and  Claverley stations – erection of 7 cottages – tender of D Hall accepted,  amount £6300.0.0.
|Waipara – Blenheim Railway
| -
|W 34/1
|PWD
|Canterbury
|S
|19621
|-
|Hundalee
| -
| -
| -
|10/1939
|Station buildings – no tenders  received.
|Waipara – Blenheim Railway
| -
|W 34/1
|PWD
|Canterbury
|S
|19622
|-
|Hundalee
| -
| -
| -
|27/11/1939
|Accommodation shelter shed,  passenger platform (left side of line, goods shed 30ft x 20ft, loading bank,  cattle and sheep yards.
|Waipara – Blenheim Railway
| -
|00/2107/1
|NZRLS
|Canterbury
|S
|19623
|-
|Hundalee
| -
| -
| -
|27/11/1939
|First goods train to Hundalee.
|Waipara – Blenheim Railway
| -
|W3180, Pub 1/3
|WRD
|Marlborough
|S
|19624
|-
|Hundalee
| -
| -
| -
|27/11/1939
|Loop 62 wagons, loop 27 wagons,  loop 27 wagons, backshunt 15 wagons (cattle yards).
|Waipara – Blenheim Railway
| -
|00/2107/1
|NZRLS
|Canterbury
|S
|19625
|-
|Hundalee
| -
| -
| -
|27/11/1939
|Parnassus to Hundalee Section  handed over to Working Railways Department. Hundalee station opened, 94 miles  51 chains from Addington.
|Waipara – Blenheim Railway
| -
|00/2107/1
|NZRLS
|Canterbury
|S
|19626
|-
|Hundalee
| -
| -
| -
|27/11/1939
|Parnassus to Hundalee Section  opened for goods traffic, length 11 miles 60 chains.
|Waipara – Blenheim Railway
| -
|W1, 12/1
|PWD
|Canterbury
|S
|19627
|-
|Hundalee
| -
| -
| -
|27/11/1939
|Work completed on new line  between Parnassus and Hundalee.
|Waipara – Blenheim Railway
| -
|W3180, Pub 3
|WRD
|Canterbury
|S
|19628
|-
|Hundalee
| -
| -
| -
|11/12/1939
|First passenger train to  Hundalee.
|Waipara – Blenheim Railway
| -
|W3180, Pub 1/3
|WRD
|Marlborough
|S
|19629
|-
|Hundalee
| -
| -
| -
|11/12/1939
|Parnassus to Hundalee Section  opened for passenger traffic.
|Waipara – Blenheim Railway
| -
|W1, 12/1
|PWD
|Canterbury
|S
|19630
|-
|Hundalee
| -
| -
| -
|14/12/1939
|Requesting authority £120 for  furnishing Hundalee station.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19631
|-
|Hundalee
| -
| -
| -
|21/8/1940
|Hundalee is the present terminus  of the southern section.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19632
|-
|Hundalee
| -
| -
| -
|1/8/1941
|Parnassus to Hundalee Section  handed over to Railways Department.
|Waipara – Blenheim Railway
| -
|W1, 12/1
|PWD
|Canterbury
|S
|19633
|-
|Hundalee
| -
| -
| -
|1/4/1942
|Post Office operated by Railways  Department staff opened.
|Waipara – Blenheim Railway
| -
|Mails by Rail in NZ
|R Startup
|Canterbury
|S
|19634
|-
|Hundalee
| -
| -
| -
|24/6/1942
|Three permanent cottages have  been completed.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19635
|-
|Hundalee
| -
| -
| -
|8/7/1943
|The line between Oaro and  Hundalee will be open for traffic on Thursday 8<sup>th</sup> instant.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19636
|-
|Hundalee
| -
| -
| -
|14/7/1943
|The line between Oaro and  Hundalee has been closed because of slips.
|Waipara – Blenheim Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|19637
|-
|Hundalee
| -
| -
| -
|3/7/1944
|Post Office removed from  station.
|Waipara – Blenheim Railway
| -
|Mails by Rail in NZ
|R Startup
|Canterbury
|S
|19638
|-
|Hundalee
| -
| -
| -
|13/12/1945
|On Saturday, 15/12/1945, the  Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be  taken over by the Working Railways Department.
|Waipara – Blenheim Railway
| -
|W 2903
|WRD
|Marlborough
|S
|19639
|-
|Hundalee
| -
| -
| -
|17/12/1945
|Work completed on new line  between Hundalee and Kaikoura.
|Waipara – Blenheim Railway
| -
|W3180, Pub 3
|WRD
|Canterbury
|S
|19640
|-
|Hundalee
| -
| -
| -
|29/7/1948
|Name approved for Public Works  Department in 1939. North bank of Conway River.
|Waipara – Blenheim Railway
| -
|W3199, 00/2107/1
|WRD
|Canterbury
|S
|19641
|-
|Hundalee
| -
| -
| -
|2/10/1960
|Mileage 96 miles 5 chains from  Christchurch.
|Waipara – Blenheim Railway
| -
|W 3337
|WRD
|Marlborough
|S
|19642
|-
|Hundalee
| -
| -
| -
|29/3/1981
|Closed to all traffic.
|Waipara – Blenheim Railway
| -
|W 3337
|WRD
|Marlborough
|S
|19643
|-
|Hundalee
| -
| -
| -
|15/3/1984
|Closed for all traffic.
|Waipara – Blenheim Railway
| -
|00/2107/1
|NZRLS
|Canterbury
|S
|19644
|}

Latest revision as of 19:17, 31 January 2022

Ferniehurst Hundalee Claverley
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Ferniehurst--Hundalee Hundalee--Claverley
8.8km 5.7km

Go to Hundalee on the Network Diagram



Hundalee - - - 1/4/1936 Buildings, etc., required at Hundalee: approach road, 2 No points and crossings (1 in 9), shelter shed and ladies waiting room (PWD 56529), platform, 200ft (PWD 24118, concrete), latrines (2 stall), goods shed (30ft x 20ft with verandah), loading bank (PWD 24118, concrete, 27ft x 15ft), sheep and cattle yards (PWD 24816, double yards), water supply, 2 No stop blocks, platform fences, 2 No platelayers' cottages. Waipara – Blenheim Railway - W1, 12/1 PWD Marlborough S 19618
Hundalee - - - 11/10/1937 Hundalee station arrangement approved. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19619
Hundalee - - - 27/9/1938 Buildings required at Hundalee: station building (62ft x 13ft, PWD Drawing 8851, with stationmaster's office extended 8ft), goods shed (35ft x 20ft), three staff cottages. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19620
Hundalee - - - 10/1939 Ferniehurst, Hundalee, and Claverley stations – erection of 7 cottages – tender of D Hall accepted, amount £6300.0.0. Waipara – Blenheim Railway - W 34/1 PWD Canterbury S 19621
Hundalee - - - 10/1939 Station buildings – no tenders received. Waipara – Blenheim Railway - W 34/1 PWD Canterbury S 19622
Hundalee - - - 27/11/1939 Accommodation shelter shed, passenger platform (left side of line, goods shed 30ft x 20ft, loading bank, cattle and sheep yards. Waipara – Blenheim Railway - 00/2107/1 NZRLS Canterbury S 19623
Hundalee - - - 27/11/1939 First goods train to Hundalee. Waipara – Blenheim Railway - W3180, Pub 1/3 WRD Marlborough S 19624
Hundalee - - - 27/11/1939 Loop 62 wagons, loop 27 wagons, loop 27 wagons, backshunt 15 wagons (cattle yards). Waipara – Blenheim Railway - 00/2107/1 NZRLS Canterbury S 19625
Hundalee - - - 27/11/1939 Parnassus to Hundalee Section handed over to Working Railways Department. Hundalee station opened, 94 miles 51 chains from Addington. Waipara – Blenheim Railway - 00/2107/1 NZRLS Canterbury S 19626
Hundalee - - - 27/11/1939 Parnassus to Hundalee Section opened for goods traffic, length 11 miles 60 chains. Waipara – Blenheim Railway - W1, 12/1 PWD Canterbury S 19627
Hundalee - - - 27/11/1939 Work completed on new line between Parnassus and Hundalee. Waipara – Blenheim Railway - W3180, Pub 3 WRD Canterbury S 19628
Hundalee - - - 11/12/1939 First passenger train to Hundalee. Waipara – Blenheim Railway - W3180, Pub 1/3 WRD Marlborough S 19629
Hundalee - - - 11/12/1939 Parnassus to Hundalee Section opened for passenger traffic. Waipara – Blenheim Railway - W1, 12/1 PWD Canterbury S 19630
Hundalee - - - 14/12/1939 Requesting authority £120 for furnishing Hundalee station. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19631
Hundalee - - - 21/8/1940 Hundalee is the present terminus of the southern section. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19632
Hundalee - - - 1/8/1941 Parnassus to Hundalee Section handed over to Railways Department. Waipara – Blenheim Railway - W1, 12/1 PWD Canterbury S 19633
Hundalee - - - 1/4/1942 Post Office operated by Railways Department staff opened. Waipara – Blenheim Railway - Mails by Rail in NZ R Startup Canterbury S 19634
Hundalee - - - 24/6/1942 Three permanent cottages have been completed. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19635
Hundalee - - - 8/7/1943 The line between Oaro and Hundalee will be open for traffic on Thursday 8th instant. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19636
Hundalee - - - 14/7/1943 The line between Oaro and Hundalee has been closed because of slips. Waipara – Blenheim Railway - W1, 12/71 PWD Marlborough S 19637
Hundalee - - - 3/7/1944 Post Office removed from station. Waipara – Blenheim Railway - Mails by Rail in NZ R Startup Canterbury S 19638
Hundalee - - - 13/12/1945 On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. Waipara – Blenheim Railway - W 2903 WRD Marlborough S 19639
Hundalee - - - 17/12/1945 Work completed on new line between Hundalee and Kaikoura. Waipara – Blenheim Railway - W3180, Pub 3 WRD Canterbury S 19640
Hundalee - - - 29/7/1948 Name approved for Public Works Department in 1939. North bank of Conway River. Waipara – Blenheim Railway - W3199, 00/2107/1 WRD Canterbury S 19641
Hundalee - - - 2/10/1960 Mileage 96 miles 5 chains from Christchurch. Waipara – Blenheim Railway - W 3337 WRD Marlborough S 19642
Hundalee - - - 29/3/1981 Closed to all traffic. Waipara – Blenheim Railway - W 3337 WRD Marlborough S 19643
Hundalee - - - 15/3/1984 Closed for all traffic. Waipara – Blenheim Railway - 00/2107/1 NZRLS Canterbury S 19644