File Records:Elevation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Trail_Station|Prev_Station=[[Mount_Pleasant]]|Next_Station=[[Picton]]|Prev_Section=[[Mount_Pleasant--Elevation]]|Next_Section=[[Elevation--Picton]]}} | {{Trail_Station|Prev_Station=[[Mount_Pleasant]]|Next_Station=[[Picton]]|Prev_Section=[[Mount_Pleasant--Elevation]]|Next_Section=[[Elevation--Picton]]|Prev_Dist=3km|Next_Dist=3.1km}} | ||
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | [[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | ||
Latest revision as of 01:00, 28 January 2022
Mount_Pleasant | Elevation | Picton | ||||||||||||||||||||||
Mount_Pleasant--Elevation | Elevation--Picton | |||||||||||||||||||||||
3km | 3.1km |
Go to Elevation on the Network Diagram
Name | Alt 1 | Alt 2 | Alt 3 | Details | Railway | Rly 2 | Reference | Source | Locality | Island | Sequence | |
Elevation | - | - | - | 21/2/1910 | Water supply at Elevation. | Blenheim – Waipara Railway | Picton Section | W 3 | PWD | Marlborough | S | 11497 |
Elevation | - | - | - | 17/5/1911 | Improvements to grades. | Blenheim – Waipara Railway | Picton Section | W3734/28 | WRD | Marlborough | S | 11498 |
Elevation | - | - | - | 3/1950 | Backshunt and loading bank removed. | Blenheim – Waipara Railway | Picton Section | W2382, 039 | WRD | Marlborough | S | 11499 |
Elevation | - | - | - | 2/10/1960 | Mileage 95 miles 74 chains from Kaikoura. | Blenheim – Waipara Railway | Picton Section | W 3337 | WRD | Marlborough | S | 11500 |
Elevation | - | - | - | 25/9/1968 | Station will be closed to all traffic from Monday 14/10/1962. | Blenheim – Waipara Railway | Picton Section | R4, 97/3510 | WRD | Marlborough | S | 11501 |
Elevation | - | - | - | 1/2/1897 | Mileage 2 miles 9 chains from Picton. | Blenheim – Waipara Railway | Picton Section | W 3337 | WRD | Marlborough | S | 11502 |
Elevation | - | - | - | 20/11/1872 | Progress of construction is to be seen from the top of the Elevation to near the Opawa River. | Picton – Blenheim Railway | - | A&NZG | ATL | Marlborough | S | 11503 |