(Created page with "Construction of the Main North Line spanned nearly 100 years with the first portion from Addington to Rangiora built in 1872, and at the northern end from Picton to Blenhein i...") |
No edit summary |
||
Line 1: | Line 1: | ||
Construction of the Main North Line spanned nearly 100 years with the first | Construction of the Main North Line spanned nearly 100 years with the first portions from Addington to Rangiora in the south built in 1872, and at the northern end from Picton to Blenhein in 1875. The final linking section between Kaikoura and Hundalee was not completed till the end of 1945. Due to its length (348km) the description of the lines construction will be dealt with in 5 sections, roughly aligning with construction phases, but in sequence from the Christchurch end, rather than chronologically. | ||
== ADDINGTON to WAIPARA == | == ADDINGTON to WAIPARA == | ||
Line 13: | Line 13: | ||
== | == WHARANUI to PICTON == |
Revision as of 00:07, 23 January 2022
Construction of the Main North Line spanned nearly 100 years with the first portions from Addington to Rangiora in the south built in 1872, and at the northern end from Picton to Blenhein in 1875. The final linking section between Kaikoura and Hundalee was not completed till the end of 1945. Due to its length (348km) the description of the lines construction will be dealt with in 5 sections, roughly aligning with construction phases, but in sequence from the Christchurch end, rather than chronologically.