{| class="wikitable"
|Kekerengu
|Kekerengu
| -
| -
|1930
|Kekerengu station is at 62 miles  40 chains. To have sheep yards and a passenger platform.
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23524
|-
|Kekerengu
|Kekerengu
| -
| -
|11/8/1933
|Kekerengu – work abandoned.  Overbridge was to be built but only the spoil bank was completed.
|Blenheim – Waipara Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|23525
|-
|Kekerengu
|Kekerengu
| -
| -
|3/3/1936
|Work on the station yard at  Kekerengu was started in 6/1929 and closed down on 29/10/1931.
|Blenheim – Waipara Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|23526
|-
|Kekerengu
|Kekerengu
| -
| -
|23/6/1936
|Prime Minister announces start  to be made to complete the line.
|Blenheim – Waipara Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|23527
|-
|Kekerengu
|Kekerengu
| -
| -
|11/10/1937
|Station arrangement approved.
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23528
|-
|Kekerengu
|Kekerengu
| -
| -
|15/10/1937
|The station yard at Kekerengu  has yet to be formed.
|Blenheim – Waipara Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|23529
|-
|Kekerengu
|Kekerengu
| -
| -
|18/10/1937
|Mileage 62 miles 70 chains.
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23530
|-
|Kekerengu
|Kekerengu
| -
| -
|14/10/1938
|Buildings required at Kekerengu:  station building (14ft x 8ft, PWD Drawing 8848), goods shed (30ft x 20ft),  four staff houses.
|Blenheim – Waipara Railway
| -
|W1, 12/71/4
|PWD
|Marlborough
|S
|23531
|-
|Kekerengu
|Kekerengu
| -
| -
|5/7/1939
|Standard drawing 8848 shelter  shed and on extra house to be provided (house at Kekerengu instead of at  Parikawa).
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23532
|-
|Kekerengu
|Kekerengu
| -
| -
|17/8/1939
|Five platelayers' cottages –  Drawing 50976 (NZR), 98947 (PWD).
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23533
|-
|Kekerengu
|Kekerengu
| -
| -
|17/8/1939
|Goods shed, 30ft x 20ft –  Drawing 55784 (PWD);
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23534
|-
|Kekerengu
|Kekerengu
| -
| -
|17/8/1939
|Latrine, 2 stall – Drawing  43012;
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23535
|-
|Kekerengu
|Kekerengu
| -
| -
|17/8/1939
|Proposing to let a contract for  the following at Kekerengu:
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23536
|-
|Kekerengu
|Kekerengu
| -
| -
|17/8/1939
|Shelter shed, 14ft x 8ft;
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23537
|-
|Kekerengu
|Kekerengu
| -
| -
|5/5/1941
|Contractor for station buildings  is D Wemyss of Blenheim.
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23538
|-
|Kekerengu
|Kekerengu
| -
| -
|24/6/1942
|Kekerengu – five permanent  cottages are under construction here and one nearly completed. This requires  painting and papering.
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23539
|-
|Kekerengu
|Kekerengu
| -
| -
|31/7/1951
|Spelling of station name changed  from Kekerengu to Kekerengu.
|Blenheim – Waipara Railway
| -
|R-W3, 14545
|WRD
|Marlborough
|S
|23540
|-
|Kekerengu
|Kekerengu
| -
| -
|2/10/1960
|Mileage 35 miles 9 chains from  Kaikoura.
|Blenheim – Waipara Railway
| -
|W 3337
|WRD
|Marlborough
|S
|23541
|-
|Kekerengu
|Kekerengu
| -
| -
|29/3/1981
|Closed to all traffic except in  wagon lots.
|Blenheim – Waipara Railway
| -
|W 3337
|WRD
|Marlborough
|S
|23542
|-
|Kekerengu
|Kekerengu
| -
| -
|9/2/1988
|Shelter shed.
|Blenheim – Waipara Railway
| -
|JRS/P227
|ATL
|Marlborough
|S
|23543
|-
|Kekerengu
|Kekerengu
| -
| -
|0/01/1900
|
|Blenheim – Waipara Railway
| -
|W1, 12/71
|PWD
|Marlborough
|S
|23544
|-
|Kekerengu
|Kekerengu
| -
| -
|1/9/1938
|To be provided at Kekerengu:  shelter shed (14ft x 10ft), platform (200ft), loading bank, stockyards, 4  platelayers' cottages, 6,000 gallon vat and stand, water supply.
|Blenheim – Waipara Railway
| -
|W1, 12/1
|PWD
|Marlborough
|S
|23545
|-
|Kekerengu
|Kekerengu
| -
| -
|19/12/1942
|Station opened, 62 miles 78  chains from Picton.
|Blenheim – Waipara Railway
| -
|00/2107/1
|NZRLS
|Marlborough
|S
|23546
|-
|Kekerengu
|Kekerengu
| -
| -
|13/12/1945
|Mileage 62 miles 78 chains from  Addington.
|Blenheim – Waipara Railway
| -
|W 2903
|WRD
|Marlborough
|S
|23547
|-
|Kekerengu
|Kekerengu
| -
| -
|13/12/1945
|On Saturday, 15/12/1945, the  Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be  taken over by the Working Railways Department.
|Blenheim – Waipara Railway
| -
|W 2903
|WRD
|Marlborough
|S
|23548
|-
|Kekerengu
|Kekerengu
| -
| -
|29/11/1949
|Spelling of station name altered  from Kekerengu to Kekerengu in 5/1948.
|Blenheim – Waipara Railway
| -
|W3199, 00/2107/1
|WRD
|Marlborough
|S
|23549
|-
|Kekerengu
|Kekerengu
| -
| -
|31/7/1951
|Spelling of station name changed  from Kekerengu to Kekerengu.
|Blenheim – Waipara Railway
| -
|R-W3, 14545
|WRD
|Marlborough
|S
|23550
|-
|Kekerengu
|Kekerengu
| -
| -
|25/11/1988
|Still used for timetabled  running of trains.
|Blenheim – Waipara Railway
| -
|W 3337
|WRD
|Marlborough
|S
|23551
|}
{{Trail_Station|Prev_Station=[[Parikawa]]|Next_Station=[[Wharanui]]|Prev_Section=[[Parikawa - Kekerengu]]|Next_Section=[[Kekerengu - Wharanui]]}}
{{Trail_Station|Prev_Station=[[Parikawa]]|Next_Station=[[Wharanui]]|Prev_Section=[[Parikawa - Kekerengu]]|Next_Section=[[Kekerengu - Wharanui]]}}

Revision as of 23:27, 17 January 2022

Go to Kekerengu on the Network Diagram



Kekerengu Kekerengu - - 1930 Kekerengu station is at 62 miles 40 chains. To have sheep yards and a passenger platform. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23524
Kekerengu Kekerengu - - 11/8/1933 Kekerengu – work abandoned. Overbridge was to be built but only the spoil bank was completed. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 23525
Kekerengu Kekerengu - - 3/3/1936 Work on the station yard at Kekerengu was started in 6/1929 and closed down on 29/10/1931. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 23526
Kekerengu Kekerengu - - 23/6/1936 Prime Minister announces start to be made to complete the line. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 23527
Kekerengu Kekerengu - - 11/10/1937 Station arrangement approved. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23528
Kekerengu Kekerengu - - 15/10/1937 The station yard at Kekerengu has yet to be formed. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 23529
Kekerengu Kekerengu - - 18/10/1937 Mileage 62 miles 70 chains. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23530
Kekerengu Kekerengu - - 14/10/1938 Buildings required at Kekerengu: station building (14ft x 8ft, PWD Drawing 8848), goods shed (30ft x 20ft), four staff houses. Blenheim – Waipara Railway - W1, 12/71/4 PWD Marlborough S 23531
Kekerengu Kekerengu - - 5/7/1939 Standard drawing 8848 shelter shed and on extra house to be provided (house at Kekerengu instead of at Parikawa). Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23532
Kekerengu Kekerengu - - 17/8/1939 Five platelayers' cottages – Drawing 50976 (NZR), 98947 (PWD). Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23533
Kekerengu Kekerengu - - 17/8/1939 Goods shed, 30ft x 20ft – Drawing 55784 (PWD); Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23534
Kekerengu Kekerengu - - 17/8/1939 Latrine, 2 stall – Drawing 43012; Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23535
Kekerengu Kekerengu - - 17/8/1939 Proposing to let a contract for the following at Kekerengu: Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23536
Kekerengu Kekerengu - - 17/8/1939 Shelter shed, 14ft x 8ft; Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23537
Kekerengu Kekerengu - - 5/5/1941 Contractor for station buildings is D Wemyss of Blenheim. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23538
Kekerengu Kekerengu - - 24/6/1942 Kekerengu – five permanent cottages are under construction here and one nearly completed. This requires painting and papering. Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23539
Kekerengu Kekerengu - - 31/7/1951 Spelling of station name changed from Kekerengu to Kekerengu. Blenheim – Waipara Railway - R-W3, 14545 WRD Marlborough S 23540
Kekerengu Kekerengu - - 2/10/1960 Mileage 35 miles 9 chains from Kaikoura. Blenheim – Waipara Railway - W 3337 WRD Marlborough S 23541
Kekerengu Kekerengu - - 29/3/1981 Closed to all traffic except in wagon lots. Blenheim – Waipara Railway - W 3337 WRD Marlborough S 23542
Kekerengu Kekerengu - - 9/2/1988 Shelter shed. Blenheim – Waipara Railway - JRS/P227 ATL Marlborough S 23543
Kekerengu Kekerengu - - 0/01/1900 Blenheim – Waipara Railway - W1, 12/71 PWD Marlborough S 23544
Kekerengu Kekerengu - - 1/9/1938 To be provided at Kekerengu: shelter shed (14ft x 10ft), platform (200ft), loading bank, stockyards, 4 platelayers' cottages, 6,000 gallon vat and stand, water supply. Blenheim – Waipara Railway - W1, 12/1 PWD Marlborough S 23545
Kekerengu Kekerengu - - 19/12/1942 Station opened, 62 miles 78 chains from Picton. Blenheim – Waipara Railway - 00/2107/1 NZRLS Marlborough S 23546
Kekerengu Kekerengu - - 13/12/1945 Mileage 62 miles 78 chains from Addington. Blenheim – Waipara Railway - W 2903 WRD Marlborough S 23547
Kekerengu Kekerengu - - 13/12/1945 On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. Blenheim – Waipara Railway - W 2903 WRD Marlborough S 23548
Kekerengu Kekerengu - - 29/11/1949 Spelling of station name altered from Kekerengu to Kekerengu in 5/1948. Blenheim – Waipara Railway - W3199, 00/2107/1 WRD Marlborough S 23549
Kekerengu Kekerengu - - 31/7/1951 Spelling of station name changed from Kekerengu to Kekerengu. Blenheim – Waipara Railway - R-W3, 14545 WRD Marlborough S 23550
Kekerengu Kekerengu - - 25/11/1988 Still used for timetabled running of trains. Blenheim – Waipara Railway - W 3337 WRD Marlborough S 23551
Parikawa Kekerengu Wharanui
Trail StnSL.png Trail SectR.png Trail StnL.png Trail SectR.png Trail StnSR.png
Parikawa - Kekerengu Kekerengu - Wharanui
{{{Prev_Dist}}} {{{Next_Dist}}}