File Records:Kekerengu: Difference between revisions
Jump to navigation
Jump to search
(Created page with " Go to {{PAGENAME}} on the Network Diagram {{Trail_Station|Prev_Station=Parikawa|Next_Station=Wharanui|Prev_Section=P...") |
(y) |
||
Line 1: | Line 1: | ||
[[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | [[South_Island_Network_Diagram#{{PAGENAME}} | Go to {{PAGENAME}} on the Network Diagram]] | ||
{| class="wikitable" | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|1930 | |||
|Kekerengu station is at 62 miles 40 chains. To have sheep yards and a passenger platform. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23524 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|11/8/1933 | |||
|Kekerengu – work abandoned. Overbridge was to be built but only the spoil bank was completed. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/1 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23525 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|3/3/1936 | |||
|Work on the station yard at Kekerengu was started in 6/1929 and closed down on 29/10/1931. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/1 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23526 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|23/6/1936 | |||
|Prime Minister announces start to be made to complete the line. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/1 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23527 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|11/10/1937 | |||
|Station arrangement approved. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23528 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|15/10/1937 | |||
|The station yard at Kekerengu has yet to be formed. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/1 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23529 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|18/10/1937 | |||
|Mileage 62 miles 70 chains. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23530 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|14/10/1938 | |||
|Buildings required at Kekerengu: station building (14ft x 8ft, PWD Drawing 8848), goods shed (30ft x 20ft), four staff houses. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71/4 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23531 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|5/7/1939 | |||
|Standard drawing 8848 shelter shed and on extra house to be provided (house at Kekerengu instead of at Parikawa). | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23532 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|17/8/1939 | |||
|Five platelayers' cottages – Drawing 50976 (NZR), 98947 (PWD). | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23533 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|17/8/1939 | |||
|Goods shed, 30ft x 20ft – Drawing 55784 (PWD); | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23534 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|17/8/1939 | |||
|Latrine, 2 stall – Drawing 43012; | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23535 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|17/8/1939 | |||
|Proposing to let a contract for the following at Kekerengu: | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23536 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|17/8/1939 | |||
|Shelter shed, 14ft x 8ft; | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23537 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|5/5/1941 | |||
|Contractor for station buildings is D Wemyss of Blenheim. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23538 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|24/6/1942 | |||
|Kekerengu – five permanent cottages are under construction here and one nearly completed. This requires painting and papering. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23539 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|31/7/1951 | |||
|Spelling of station name changed from Kekerengu to Kekerengu. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|R-W3, 14545 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23540 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|2/10/1960 | |||
|Mileage 35 miles 9 chains from Kaikoura. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23541 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|29/3/1981 | |||
|Closed to all traffic except in wagon lots. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23542 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|9/2/1988 | |||
|Shelter shed. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|JRS/P227 | |||
|ATL | |||
|Marlborough | |||
|S | |||
|23543 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|0/01/1900 | |||
| | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/71 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23544 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|1/9/1938 | |||
|To be provided at Kekerengu: shelter shed (14ft x 10ft), platform (200ft), loading bank, stockyards, 4 platelayers' cottages, 6,000 gallon vat and stand, water supply. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W1, 12/1 | |||
|PWD | |||
|Marlborough | |||
|S | |||
|23545 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|19/12/1942 | |||
|Station opened, 62 miles 78 chains from Picton. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|00/2107/1 | |||
|NZRLS | |||
|Marlborough | |||
|S | |||
|23546 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|13/12/1945 | |||
|Mileage 62 miles 78 chains from Addington. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W 2903 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23547 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|13/12/1945 | |||
|On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W 2903 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23548 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|29/11/1949 | |||
|Spelling of station name altered from Kekerengu to Kekerengu in 5/1948. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W3199, 00/2107/1 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23549 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|31/7/1951 | |||
|Spelling of station name changed from Kekerengu to Kekerengu. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|R-W3, 14545 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23550 | |||
|- | |||
|Kekerengu | |||
|Kekerengu | |||
| - | |||
| - | |||
|25/11/1988 | |||
|Still used for timetabled running of trains. | |||
|Blenheim – Waipara Railway | |||
| - | |||
|W 3337 | |||
|WRD | |||
|Marlborough | |||
|S | |||
|23551 | |||
|} | |||
{{Trail_Station|Prev_Station=[[Parikawa]]|Next_Station=[[Wharanui]]|Prev_Section=[[Parikawa - Kekerengu]]|Next_Section=[[Kekerengu - Wharanui]]}} | {{Trail_Station|Prev_Station=[[Parikawa]]|Next_Station=[[Wharanui]]|Prev_Section=[[Parikawa - Kekerengu]]|Next_Section=[[Kekerengu - Wharanui]]}} |
Revision as of 23:27, 17 January 2022
Go to Kekerengu on the Network Diagram
Kekerengu | Kekerengu | - | - | 1930 | Kekerengu station is at 62 miles 40 chains. To have sheep yards and a passenger platform. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23524 |
Kekerengu | Kekerengu | - | - | 11/8/1933 | Kekerengu – work abandoned. Overbridge was to be built but only the spoil bank was completed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23525 |
Kekerengu | Kekerengu | - | - | 3/3/1936 | Work on the station yard at Kekerengu was started in 6/1929 and closed down on 29/10/1931. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23526 |
Kekerengu | Kekerengu | - | - | 23/6/1936 | Prime Minister announces start to be made to complete the line. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23527 |
Kekerengu | Kekerengu | - | - | 11/10/1937 | Station arrangement approved. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23528 |
Kekerengu | Kekerengu | - | - | 15/10/1937 | The station yard at Kekerengu has yet to be formed. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23529 |
Kekerengu | Kekerengu | - | - | 18/10/1937 | Mileage 62 miles 70 chains. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23530 |
Kekerengu | Kekerengu | - | - | 14/10/1938 | Buildings required at Kekerengu: station building (14ft x 8ft, PWD Drawing 8848), goods shed (30ft x 20ft), four staff houses. | Blenheim – Waipara Railway | - | W1, 12/71/4 | PWD | Marlborough | S | 23531 |
Kekerengu | Kekerengu | - | - | 5/7/1939 | Standard drawing 8848 shelter shed and on extra house to be provided (house at Kekerengu instead of at Parikawa). | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23532 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Five platelayers' cottages – Drawing 50976 (NZR), 98947 (PWD). | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23533 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Goods shed, 30ft x 20ft – Drawing 55784 (PWD); | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23534 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Latrine, 2 stall – Drawing 43012; | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23535 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Proposing to let a contract for the following at Kekerengu: | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23536 |
Kekerengu | Kekerengu | - | - | 17/8/1939 | Shelter shed, 14ft x 8ft; | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23537 |
Kekerengu | Kekerengu | - | - | 5/5/1941 | Contractor for station buildings is D Wemyss of Blenheim. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23538 |
Kekerengu | Kekerengu | - | - | 24/6/1942 | Kekerengu – five permanent cottages are under construction here and one nearly completed. This requires painting and papering. | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23539 |
Kekerengu | Kekerengu | - | - | 31/7/1951 | Spelling of station name changed from Kekerengu to Kekerengu. | Blenheim – Waipara Railway | - | R-W3, 14545 | WRD | Marlborough | S | 23540 |
Kekerengu | Kekerengu | - | - | 2/10/1960 | Mileage 35 miles 9 chains from Kaikoura. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23541 |
Kekerengu | Kekerengu | - | - | 29/3/1981 | Closed to all traffic except in wagon lots. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23542 |
Kekerengu | Kekerengu | - | - | 9/2/1988 | Shelter shed. | Blenheim – Waipara Railway | - | JRS/P227 | ATL | Marlborough | S | 23543 |
Kekerengu | Kekerengu | - | - | 0/01/1900 | Blenheim – Waipara Railway | - | W1, 12/71 | PWD | Marlborough | S | 23544 | |
Kekerengu | Kekerengu | - | - | 1/9/1938 | To be provided at Kekerengu: shelter shed (14ft x 10ft), platform (200ft), loading bank, stockyards, 4 platelayers' cottages, 6,000 gallon vat and stand, water supply. | Blenheim – Waipara Railway | - | W1, 12/1 | PWD | Marlborough | S | 23545 |
Kekerengu | Kekerengu | - | - | 19/12/1942 | Station opened, 62 miles 78 chains from Picton. | Blenheim – Waipara Railway | - | 00/2107/1 | NZRLS | Marlborough | S | 23546 |
Kekerengu | Kekerengu | - | - | 13/12/1945 | Mileage 62 miles 78 chains from Addington. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | S | 23547 |
Kekerengu | Kekerengu | - | - | 13/12/1945 | On Saturday, 15/12/1945, the Hundalee – Kaikoura Section of the South Island Main Trunk Railway will be taken over by the Working Railways Department. | Blenheim – Waipara Railway | - | W 2903 | WRD | Marlborough | S | 23548 |
Kekerengu | Kekerengu | - | - | 29/11/1949 | Spelling of station name altered from Kekerengu to Kekerengu in 5/1948. | Blenheim – Waipara Railway | - | W3199, 00/2107/1 | WRD | Marlborough | S | 23549 |
Kekerengu | Kekerengu | - | - | 31/7/1951 | Spelling of station name changed from Kekerengu to Kekerengu. | Blenheim – Waipara Railway | - | R-W3, 14545 | WRD | Marlborough | S | 23550 |
Kekerengu | Kekerengu | - | - | 25/11/1988 | Still used for timetabled running of trains. | Blenheim – Waipara Railway | - | W 3337 | WRD | Marlborough | S | 23551 |
Parikawa | Kekerengu | Wharanui | ||||||||||||||||||||||
Parikawa - Kekerengu | Kekerengu - Wharanui | |||||||||||||||||||||||
{{{Prev_Dist}}} | {{{Next_Dist}}} |